9.3.2
Checking the screw connections
n
Screw connections
Screw connections have been tightened to the specified torque and locked at the factory. Vibrations
and shocks, in particular during the initial operating hours, can loosen screw connections.
u
Check all screw connections for tightness.
Some components are mounted with self-locking nuts.
u
When mounting these components, always use new self-locking nuts.
Observe the tightening torques of the standard screw connections.
•
n
Trailer coupling
u
Check all screw connections for tightness.
u
If necessary, retighten the screw connection of the trailer coupling with 560 Nm.
n
Towing bar
u
Check all screw connections for tightness.
u
If necessary, retighten the screw connection of the towing bar with 440 Nm.
n
Wheel nut
u
Check the wheel nuts for tightness.
w
Every 500 operating hours
or after 8,500 km
u
If necessary, retighten the screw connection with 510 Nm.
9.4
Covers
There are several covers attached to the machine. During certain maintenance steps, they must be
opened or removed.
After maintaining your machine,
reattach or close and secure all covers
.
9. Maintenance and service
AXENT 90.1
5903360
87
Summary of Contents for AXENT 90.1
Page 119: ...12 Appendix 12 Appendix AXENT 90 1 5903360 119...
Page 126: ......