Claims for damage other than to the machine will not be accepted.
This also means that no liability will be accepted for damage resulting from spreading errors.
7.2
Conveyor belt speed adjustment
The conveyor belt is started up and stopped automatically. Via the machine control unit, the status of
the conveyor belt can be checked at the screen.
The electronic conveyor belt control is described in a separate operator’s manual for the electronic
machine control unit. This separate operator’s manual is an integral part of the AXENT ISOBUS
machine control unit.
If the speed of the conveyor belt is too low in comparison with the application rate set at the
spreading unit, there is no notification that the spreading unit hopper is full. This may lead to
spreading errors or underfertilization in the spread fields as the hopper may be emptied.
•
Increase the speed of the conveyor belt.
7.3
Adjusting the opening of the pre-metering slide
You can adjust the opening of the pre-metering slide on the scale plate. The scale plate is located at
the left rear (viewed in the direction of travel).
Fig. 33: Scale plate of pre-metering slide opening
u
Release the scale mounting screw [1].
u
Use the lever to move the pointer to scale value 100.
w
This will result in optimum fertilizer flow into the spreading unit hopper.
u
Tighten the mounting screws again.
7. Spreading operation
62
5903360
AXENT 90.1
Summary of Contents for AXENT 90.1
Page 119: ...12 Appendix 12 Appendix AXENT 90 1 5903360 119...
Page 126: ......