EGRO 5511
Manual
HYDRAULIC & STEAM
Steam Boiler
- continued
TS STEAM WAND SOLENOID
Located between the grinder chutes. 3 way
solenoid. Waste ties into drain tray. When
opened, steam is allowed to pass through to
steam wand.
INCOMING WATER SUPPLY
TS STEAM WAND SOLENOID
WATER LEVEL PROBE
INCOMING WATER SUPPLY
Incoming water supply from fill solenoid on the
cold water block.
WATER LEVEL PROBE
Regulates the water level in the steam boiler.
Red wire: Sends data to motherboard.
Blue wire: Grounded on top of boiler,
connects to motherboard.
INJECTION CHAMBER
INJECTION CHAMBER
Union where steam meets water from coffee
boiler, and continues on to hot water tap.
Page 56
Summary of Contents for EGRO 5511
Page 1: ...EGRO 5511 Technical Manual Technical Manual ...
Page 2: ......
Page 4: ...Page 4 ...
Page 5: ...EGRO 5511 Manual SECTION 1 INTRODUCTION OVERVIEW Page 5 ...
Page 8: ...Page 8 ...
Page 9: ...EGRO 5511 Manual SECTION 2 INSTALLATION Page 9 ...
Page 15: ...Page 15 ...
Page 16: ...EGRO 5511 Manual SECTION 3 PROGRAMMING Page 16 ...
Page 40: ...Page 39 ...
Page 41: ...EGRO 5511 Manual SECTION 4 ELECTRICAL Page 40 ...
Page 50: ...Page 49 ...
Page 51: ...Page 50 ...
Page 52: ...Page 51 ...
Page 53: ...EGRO 5511 Manual SECTION 5 HYDRAULIC STEAM Page 52 ...
Page 58: ...EGRO 5511 Manual HYDRAULIC STEAM Brew Group Assembly D D F G C C C C E E H B A Page 57 ...
Page 60: ...Page 59 ...
Page 61: ...EGRO 5511 Manual SECTION 6 ADJUSTMENT MAINTENANCE Page 60 ...
Page 69: ...5 Page 68 ...