EGRO 5511
Manual
5 SUBMENU
MONITOR
5.1 Function VALVE TEST
Monitor functions allow various machine components to be checked. No test can check com-
pletely the entire functionality of any component. In addition during error testing, the me-
chanical soundness of the component must be confirmed.
The automatic heating is switched off in the monitor programme!
Function:
Functioning of valves, testing the
electrical connections
Selection: +/-
Start/Stop:
↓
Status:
1 = valve active
0 = valve idle
BV
Y1 0
Component
Status
Display
Component
Jack on con-
trol card
LED
(red)
BV
Y1
0
Brewing valve
J10/ 1-2
9
TEA
Y2
0
Hot water (tea valve) / Steam added
J10/3-4/5-6
10
ST-FILL
Y3
0
Steam boiler refill valve
J10/7-8
11
CAP
Y4
0
Steam valve for Cappuccino
J10/9-10
12
RES1
Y5
0
Spare (Cappuccino right)
J10/11-12
13
RES2 Y6 0
Spare
J10/13-14
14
PLEASE NOTE:
Restart the machine after using the monitor section.
Page 30
Summary of Contents for EGRO 5511
Page 1: ...EGRO 5511 Technical Manual Technical Manual ...
Page 2: ......
Page 4: ...Page 4 ...
Page 5: ...EGRO 5511 Manual SECTION 1 INTRODUCTION OVERVIEW Page 5 ...
Page 8: ...Page 8 ...
Page 9: ...EGRO 5511 Manual SECTION 2 INSTALLATION Page 9 ...
Page 15: ...Page 15 ...
Page 16: ...EGRO 5511 Manual SECTION 3 PROGRAMMING Page 16 ...
Page 40: ...Page 39 ...
Page 41: ...EGRO 5511 Manual SECTION 4 ELECTRICAL Page 40 ...
Page 50: ...Page 49 ...
Page 51: ...Page 50 ...
Page 52: ...Page 51 ...
Page 53: ...EGRO 5511 Manual SECTION 5 HYDRAULIC STEAM Page 52 ...
Page 58: ...EGRO 5511 Manual HYDRAULIC STEAM Brew Group Assembly D D F G C C C C E E H B A Page 57 ...
Page 60: ...Page 59 ...
Page 61: ...EGRO 5511 Manual SECTION 6 ADJUSTMENT MAINTENANCE Page 60 ...
Page 69: ...5 Page 68 ...