EGRO 5511
Manual
GRINDER BURR REPLACEMENT
Grinder Burr Replacement
1.
Turn off the machine and unplug
2.
Remove the bean hoppers
3.
Remove the top panel
a.
This requires all 3 side panels need to be removed; after the screws are removed
4.
Remove Locking plate
a.
To do this; remove the two standard screws.
5.
Unscrew the upper burr plate by rotating in a counter-clockwise motion.
6.
Remove old burrs
a.
Remove the 3 standard screws on each burr; the upper burr plate that was removed and the
Burr in the bottom of the grinding chambers. Note that the upper burr on the top panel is different and
the new burr must match.
7.
Clean upper and lower burr plate
8.
Install new burrs.
9.
Re-insert the upper burr plate into grinding chamber.
a.
Screw in till the burrs touch then back off ¼ turn.
10.
Re-assemble the top plate and the side panels
11.
Turn the machine
a.
Allow the machine to reach operating temperature.
12.
Check the Grind in the “Tech menu/ Config 1/ Grinders/ Test
a.
Achieve a espresso grind
13.
Dial in the 10 grams
Page 64
Summary of Contents for EGRO 5511
Page 1: ...EGRO 5511 Technical Manual Technical Manual ...
Page 2: ......
Page 4: ...Page 4 ...
Page 5: ...EGRO 5511 Manual SECTION 1 INTRODUCTION OVERVIEW Page 5 ...
Page 8: ...Page 8 ...
Page 9: ...EGRO 5511 Manual SECTION 2 INSTALLATION Page 9 ...
Page 15: ...Page 15 ...
Page 16: ...EGRO 5511 Manual SECTION 3 PROGRAMMING Page 16 ...
Page 40: ...Page 39 ...
Page 41: ...EGRO 5511 Manual SECTION 4 ELECTRICAL Page 40 ...
Page 50: ...Page 49 ...
Page 51: ...Page 50 ...
Page 52: ...Page 51 ...
Page 53: ...EGRO 5511 Manual SECTION 5 HYDRAULIC STEAM Page 52 ...
Page 58: ...EGRO 5511 Manual HYDRAULIC STEAM Brew Group Assembly D D F G C C C C E E H B A Page 57 ...
Page 60: ...Page 59 ...
Page 61: ...EGRO 5511 Manual SECTION 6 ADJUSTMENT MAINTENANCE Page 60 ...
Page 69: ...5 Page 68 ...