© 2005 SANDVIK TAMROCK CORP.
Page 26 - OPERATION
Operation
S 83 STD
20. Do not operate the hammer with the carrier's boom, stick or bucket cylinders at
the end of their stroke (either fully extended or fully retracted). Damage to the
carrier may result.
21. Do not use the hammer or hammer tools for lifting. Lifting eyes on the hammer
are for storage and maintenance purposes only.
22. The tool shank must be well greased during operation. Regular visual inspec-
tions during operation are recommended. An unlubricated tool shank requires
more frequent greasing intervals. A tool shank covered with excessive grease
requires less frequent greasing intervals.
Summary of Contents for S 83 STD
Page 1: ...3 05 OPERATION AND MAINTENANCE OMS83SENG 305 HYDRAULIC HAMMER RAMMER S 83 STD ...
Page 3: ...OPERATION Page 3 2005 SANDVIK TAMROCK CORP S 83 STD OPERATION ...
Page 30: ... 2005 SANDVIK TAMROCK CORP Page 30 OPERATION Operation S 83 STD ...
Page 31: ...LUBRICATION Page 31 2005 SANDVIK TAMROCK CORP S 83 STD LUBRICATION ...
Page 39: ...MAINTENANCE Page 39 2005 SANDVIK TAMROCK CORP S 83 STD MAINTENANCE ...
Page 53: ...SPECIFICATIONS Page 53 2005 SANDVIK TAMROCK CORP S 83 STD SPECIFICATIONS ...