OPERATION - Page 17
© 2005 SANDVIK TAMROCK CORP.
Operation
S 83 STD
5. OPERATION
5.1 OPERATING INSTRUCTIONS
RECOMMENDED USE
The hammer is designed to be used in breaking oversized boulders, demolishing
heavily reinforced concrete structures and for major heavy excavation and clearing
work. It can be also used for primary breaking, tunnelling and removal of metallur-
gical slag. Your local dealer will gladly give you more information.
OPERATING CONDITIONS
Principle of installation
Almost all carriers meeting mechanical and hydraulic requirements can be used to
operate the attachment. See “Hammer specifications” on page 54. The product is in-
stalled on the carrier much in the same manner as installing a bucket or other attach-
ments. A top mounted attachment requires a separate mounting bracket.
The attachment is connected to a carrier's hydraulic circuit with an installation kit.
If the carrier is already equipped with an installation kit, the installation requires
only suitable hoses and fittings. If the carrier does not have suitable kit to run the
attachment, one must be built. This may require more complex installation includ-
ing new piping and additional valves such as directional valve and pressure relief
valve.
Suitable kits can be ordered from the manufacturer or local dealers, from carrier
manufacturers and their dealers or from third party suppliers.
Hydraulic oil
In general the hydraulic oil originally intended for the carrier can be used with this
product. See “Requirements for hydraulic oil” on page 34.
Operating temperature
The operating temperature is -20 °C to +80 °C (-4 °F to +176 °F). If the temperature
is lower than -20 °C (-4 °F), the hammer and tool have to be preheated before any
operations can begin, in order to avoid breaking the accumulator's membrane and
the tool. During operation they will remain warm.
Note: The temperature of the hydraulic oil must be monitored. Ensure that oil grade
and monitored oil temperature together guarantee correct oil viscosity. See “Oil
specifications” on page 35.
Summary of Contents for S 83 STD
Page 1: ...3 05 OPERATION AND MAINTENANCE OMS83SENG 305 HYDRAULIC HAMMER RAMMER S 83 STD ...
Page 3: ...OPERATION Page 3 2005 SANDVIK TAMROCK CORP S 83 STD OPERATION ...
Page 30: ... 2005 SANDVIK TAMROCK CORP Page 30 OPERATION Operation S 83 STD ...
Page 31: ...LUBRICATION Page 31 2005 SANDVIK TAMROCK CORP S 83 STD LUBRICATION ...
Page 39: ...MAINTENANCE Page 39 2005 SANDVIK TAMROCK CORP S 83 STD MAINTENANCE ...
Page 53: ...SPECIFICATIONS Page 53 2005 SANDVIK TAMROCK CORP S 83 STD SPECIFICATIONS ...