DETAIL A
UPRIGHT
PILOT
HOLES
FACIA
DETAIL B
USE FACIA AS
A GUIDE FOR
PRE-DRILLING
HOLES
FACES MUST
BE FLUSH
Helpful Installation Hints
1.
Wear safety glasses to protect your eyes from flying wood chips when drilling or cutting.
2.
Verify that all bolts and screws are secured tightly and all acorn nuts are snug
(acorn nuts should be
tightened to 5 foot pounds of torque).
3.
DO NOT
allow children to play on the play system until it is completely assembled in a proper location.
4.
DO NOT
allow children in the area while you are assembling your play system. Many of the Rainbow Play
Systems, Inc. components are very heavy and could seriously injure a child.
5.
After thoroughly reading all information and properly locating your play system site, carefully unpack
parts.
As you unpack your play system, keep the parts list handy and become familiar with each part before
beginning assembly. Remember that a little extra time spent familiarizing yourself with the parts and
instructions before you begin will help avoid mistakes and save you time later.
6.
Group
both wood and non-wood parts together in accordance to each page, or Step, of this assembly
manual. Doing this now will help you quickly locate parts and assemble the set with ease.
7.
Sort
your hardware into groups of similar hardware pieces. Use a solid surface, such as the empty boxes, to
ensure you do not lose any hardware.
8.
Before
starting each Step, thoroughly read all of the instructions to ensure all information is understood. Pay
special attention to the orientation of each part, details & notes, and proper usage of hardware. Each piece of
hardware is required for a certain part of the assembly.
9.
Certain
steps of the assembly are best performed on a hard flat surface to ensure proper and accurate
assembly.
10.
All
Lag Bolts must have pre-drilled holes 2" deep (as shown in Detail A). Use a 1/8" drill bit for all 1/4" and
5/16" Lag Bolts and use a 1/4" drill bit for all 3/8" Lag Bolts. Lag Bolts can be difficult to put in knot holes.
Pre-drilling pilot holes will help to prevent the Lag Bolts from breaking.
11.
All
#14 Phillips Pan Head Tap Screws must have pre-drilled holes 1/2" deep. Use a 1/8" drill bit.
12.
Use
a clamp to secure facias flush to the Uprights and use holes in facia as a guide for placing Lag Bolt Pilot
Holes (as shown in Detail B).
13.
Verify
Facias are flush with Uprights.
14.
Check
assembly periodically to ensure the set is level and all facias are square to the uprights.
15. If a gap occurs between boards when inserting Screws or Lag Bolts, back out hardware and apply pressure to
the top board while reinserting hardware in the same hole.
WARNING
Drilling, sawing, sanding or machining wood products generates wood dust,
a substance known to the State of California to cause cancer. Avoid inhaling
wood dust or use a dust mask or other safeguards for personal protection.
California Health and Safety Code Section 25249.6
5