7052
7051
7054
7053
6147
H3
H119
4007
H188
N3
H216
H188
BACK SIDE OF
SUPPORT
COUNTER BORED
HOLES DOWN
23 7/8"
24"
2"
7054
7053
4007
N3
6147
1. Place Left and Right Monkey Bar Arms
(7051) (7052)
on a flat surface directly across from each other,
oriented with counter bored holes facing down as shown.
2. Insert Pipes
(N3)
in to pipe holes into both Monkey Bar Arms
(7051) (7052)
to connect the two Monkey
Bar Arms
(7051) (7052)
together.
*NOTE: Monkey Bar assembly must measure 23 7/8" wide when properly assembled.
3. Ensure width of Monkey Bar assembly is
23 7/8"
wide (as shown) and insert #8 Hardware
(H216)
through pre-drilled holes in Monkey Bar Arms
(7051) (7052)
into Pipes
(N3)
, to secure Pipes in pipe
holes.
4. Position Monkey Bar Support Legs
(7053) (7054)
on flat surface directly across from each other, with
back sides of Support Legs facing up.
5. Center Ladder Steps
(4007)
in notches of Support Legs
(7053) (7054)
and attach using #8 Hardware
(H188)
.
*NOTE: Inside faces of Support Legs must measure 24” when properly assembled.
6. Measure up
2”
from bottom of Support Legs
(7053) (7054)
and attach Monkey Bar Ground Runner
(6147)
to back side of Monkey Bar Support using 3/8” Hardware
(H3) (H119)
.
*NOTE: Counter bored holes in Monkey Bar Ground Runner (6147) should be centered on
Support Legs (7053) (7054) when properly installed.
91
Step 51
4x6 Monkey Bar
Assembly