30 5/8"
1"
THIS END OF
PENTHOUSE
AWAY FROM SET
TOPS FLUSH
TOPS FLUSH
BOTTOMS OF
THESE BOARDS
FLUSH
HOLE
OFFSET
UP
4147
4147
H1
H97
4150
6320
6320
6320
6321
H97
H1
H1
H97
3181
*NOTE: Ensure now and periodically throughout construction the Facias and Uprights are
plumb and level.
*NOTE: If installing Penthouse with Spiral, be sure to orient Penthouse correctly relative to the
side with the Spiral Slide.
1
.
Stand up Penthouse wall assemblies, positioned
30 5/8"
apart. On each end of Penthouse, measure
down
1"
from tops of Penthouse Corner Posts
(6320) (6321)
and attach Tarp Facias
(4147)
using 1/4"
Hardware
(H1) (H97)
.
*NOTE: Center counter bored hole in Tarp Facia (4147) must be offset up when properly
installed.
2. On end of Penthouse that faces away from set, attach Penthouse End Facia
(4150)
to
Penthouse
Corner Posts
(6320)
using 1/4" Hardware
(H1) (H97)
. Bottom of Penthouse End Facia
(4150)
will be
flush with bottom of previously installed Penthouse Side Board
(3181)
when properly installed.
THIS END OF
PENTHOUSE
TOWARDS SET
97
Step 56
Penthouse Assembly