A
4162 H154
H3
H121
7055
6321
0087
3182
3183
4163
3183
3180
4132
B
3180
4163
4163
*NOTE: Wood Roof installation is the same for Penthouses with and without Spiral Slide.
1. Position first Roof Board
(4163)
on Penthouse Roof Supports
(3183)
, pushed up to and flush with
ends of Tarp Board
(3180)
(as shown in Inset A). Attach Roof Board
(4163)
using #8 Hardware
(H154)
.
2. Continue attaching Roof Boards
(4162)
to Penthouse Roof Supports
(3183)
using #8 Hardware
(H154)
, making sure Roof Boards
(4162)
stay flush with the top two Roof Boards
(4163)
.
3. After Attaching Roof Boards
(4162)
, center Penthouse Wood Roof Runner
(3182)
on underside of Roof
Boards
(4162)
(4163)
and attach using #8 Hardware
(H154)
.
4. Position Filler Block
(7055)
against Penthouse Corner Post
(6321)
, directly on top of 6 Hole Facia
(4132)
and attach using 3/8" Hardware
(H3) (H121)
.
108
Step 66
Penthouse Wood Roof
Installation