Appendix J – Lightning & Grounding Guidelines
WinLink User and Installation Guide
Version 1.750
18-171
Internal ESD Protection circuits
WinLink™ is designed to meet the ETSI/FCC/Aus/NZ/CSA EMC and
Safety requirements. To fulfill these requirements, the system’s
Telecom lines at the ODU/IDU are Transformer-isolated and include
internal ESD (Electro-Static-Discharge) Protection circuits.