15
2. UNPACKING AND INSTALLATION
2.1. Place of Use
* Make sure that the ambient temperature ranges b10
°C ÷ +40 °C
* Make sure that the relative humidity is not higher than 80%,
* Slow temperature change in the course of operation,
*
Ground the module’s base should static electricity affect the
weighing result.
2.2. Unpacking and Installation
Cut the adhesive tape. Take the device out of the packaging.
Open the accessory box, take the device components out of it and
install them.
Be particularly careful while unpacking the device and installing its
components so as not to cause any damages to the platform
mechanism. Do it in accordance with the description below.
Upon completing mechanical installation, carry out electrical
connections. Depending on the preferred communication type,
connect communication cables to the appropriate connectors (for
connectors description refer to section 1.2 of this user manual). It is
recommended to use original communication cables supplied by
RADWAG. Nominal voltage of the power supply (specified on the
power supply data plate) has to be compatible with the mains
nominal voltage.
Summary of Contents for HRP 1100
Page 2: ...2 JULY 2018...
Page 4: ...4 1 GENERAL INFORMATION 1 1 Dimensions HRP 16 32 HRP 62 120...
Page 5: ...5 HRP 150 300 HRP 300 1 600 1100...
Page 6: ...6 HRP 2000 1 2 Connectors Arrangement HRP 16 32...
Page 7: ...7 HRP 62 120 HRP 150 300 300 1 600 1100 HRP 2000...
Page 18: ...18 3 Install weighing pan receivers fit them into lever seats...
Page 26: ...26 4 Disassemble transport lock by undoing screws and removing fixing washers 6...
Page 28: ...28 10 Connect the scale to the power supply...
Page 33: ...33 11 Connect the scale to the power supply...
Page 53: ...53 RS232 HRP HY10 PUE 5 cable power supply Ethernet HRP HY10 PUE 5 cables...
Page 54: ...54 Ethernet HRP Ethernet Switch Pue 7 1 cable HRP IN OUT cable...
Page 57: ...57...
Page 58: ...58...