32
7. Screw foot no. 3 so that feet no. 1, 2, 4 form a plain surface
on which platform frame is based.
8. Level the platform using feet no. 1, 2 and 4 until the air
bubble takes central position.
YES
NO
9. Unscrew foot no. 3 so that it rests on the ground. Do not
exert stress on platform frame. Do not change the level of
the platform (the air bubble has to remain in central position).
10. Install the weighing pan (3).
Summary of Contents for HRP 1100
Page 2: ...2 JULY 2018...
Page 4: ...4 1 GENERAL INFORMATION 1 1 Dimensions HRP 16 32 HRP 62 120...
Page 5: ...5 HRP 150 300 HRP 300 1 600 1100...
Page 6: ...6 HRP 2000 1 2 Connectors Arrangement HRP 16 32...
Page 7: ...7 HRP 62 120 HRP 150 300 300 1 600 1100 HRP 2000...
Page 18: ...18 3 Install weighing pan receivers fit them into lever seats...
Page 26: ...26 4 Disassemble transport lock by undoing screws and removing fixing washers 6...
Page 28: ...28 10 Connect the scale to the power supply...
Page 33: ...33 11 Connect the scale to the power supply...
Page 53: ...53 RS232 HRP HY10 PUE 5 cable power supply Ethernet HRP HY10 PUE 5 cables...
Page 54: ...54 Ethernet HRP Ethernet Switch Pue 7 1 cable HRP IN OUT cable...
Page 57: ...57...
Page 58: ...58...