11
NO
NO
YES
NO
G. In case of damage, immediately unplug the device from the
mains.
H. Platform to be decommissioned, should be decommissioned in
accordance with valid legal regulations;
1.6. Temperature Stabilization Time
Before start of the measuring processes, it is necessary to wait until
the platform reaches thermal stabilisation.
Platforms stored in much lower temperatures than the workroom
temperature, before being plugged to the mains (e.g. during winter
period), must be subjected to thermal stabilisation. The thermal
stabilisation period takes about 8 hours. During the thermal
stabilization, the indications on the screen can change. Potential
workroom temperature change shall occur gradually and slowly in the
course of the weighing instrument operation.
Summary of Contents for HRP 1100
Page 2: ...2 JULY 2018...
Page 4: ...4 1 GENERAL INFORMATION 1 1 Dimensions HRP 16 32 HRP 62 120...
Page 5: ...5 HRP 150 300 HRP 300 1 600 1100...
Page 6: ...6 HRP 2000 1 2 Connectors Arrangement HRP 16 32...
Page 7: ...7 HRP 62 120 HRP 150 300 300 1 600 1100 HRP 2000...
Page 18: ...18 3 Install weighing pan receivers fit them into lever seats...
Page 26: ...26 4 Disassemble transport lock by undoing screws and removing fixing washers 6...
Page 28: ...28 10 Connect the scale to the power supply...
Page 33: ...33 11 Connect the scale to the power supply...
Page 53: ...53 RS232 HRP HY10 PUE 5 cable power supply Ethernet HRP HY10 PUE 5 cables...
Page 54: ...54 Ethernet HRP Ethernet Switch Pue 7 1 cable HRP IN OUT cable...
Page 57: ...57...
Page 58: ...58...