background image

PLENTZIA BIDEA, 3 BILLELA AUZOTEGIA 

48100 MUNGIA- SPAIN 

APDO CORREOS, 21 

C.I.F.: A-48045199 

Tlf.: +34 94 674 04 00 

www.ibaiondo.com

 

 

 
 
 
 
 
 

 
 
 
 
 
 
 
 

 
 
 

 

 

 

 

Puffer tanks AR-S (SPECIAL 

FOR FALSE CEILINGS)  

Primary cooling systems and 

heat pumps 

Installation instructions, 

 use and maintenance 

Summary of Contents for AR-S

Page 1: ...ZOTEGIA 48100 MUNGIA SPAIN APDO CORREOS 21 C I F A 48045199 Tlf 34 94 674 04 00 www ibaiondo com Puffer tanks AR S SPECIAL FOR FALSE CEILINGS Primary cooling systems and heat pumps Installation instru...

Page 2: ...to the order and that all components are in perfect condition and that the correct operating instructions are enclosed It is especially important to check the buffer tank for possible deformations th...

Page 3: ...f valve During the heating phase for safety reasons water may escape from the exhaust duct Keep the exhaust pipe open Safety valve evacuation pipeline The evacuation of boiling water and steam must no...

Page 4: ...re parts This is an indicative layout It is never a substitute for an expert s project 7 Filling Make sure that the hoses and couplings of the system are watertight Check all connections of the accumu...

Page 5: ...alve s activation pressure and functionality Check expansion vessel pre charge Check the working pressure values and pressure fluctuations Verify temperatures 9 Declaration of Conformity INDUSTRIAS IB...

Page 6: ...AR S Model code 30002161 30003161 30004161 Nominal capacity Litres 20 30 40 Maximum working pressure Bar 6 6 6 Temperature C 10 100 10 100 10 100 Thermal insulation PU rigid PU rigid PU rigid Insulati...

Page 7: ...to run from the date of delivery by IBAIONDO The warranty does not apply if the defect is due to misuse of the product non prescribed use improper handling if the maximum pressure and or temperature...

Reviews: