36000 Kraljevo, Živojina Lazića
- Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
86
8.2 Operation start of boiler on biomass
Boiler connected to Hydraulic system.
Ensure that the probe is set to automatic flue (figure 15.).
Figure 15. Placing the probe
Check whether the mechanism for transport of pellet is firmly supported onto the floor,
that the flap of the fan is maximum opened and the flap guide for safety air is from 15 to
20 mm. (Figure 16. and 17.)
Figure 16. Position of the fan damper
Figure 17. Position of max. opening of vent. flap
Power outlet on the back boiler connected to the main power network.
Infuse a small amount of pellets in the silos and close it.
At this stage it is necessary to insert the pellets into the combustion chamber by means of
the work of the transport mechanism for the pellet (pellet feeding system). In this way we
achieve a continuously distributed pellet from the combustion chamber to the silo. The