background image

Installation Manual 

 

Combi -  cod. 99943NA – November 2002 

 

 

10 

• 

check the pressure in the system: if this has gone down and LED 13 (see fig. 2 pag. 9) comes  restore pressure

• 

close the tap on the filling loop 

once this operation is completed; 

 

Starting up the boiler 

• 

open the gas cock; 

• 

turn on the boiler;

 

• 

set selector switch 

1

 to either the 

5

 summer or 

7

 winter symbols (see fig.1 pag. 9); make sure that no. 

light is ON (see fig. 

2 pag. 9). The automatic ignition system will turn the burner on. It may be necessary to repeat the procedure a few times to 

purge air from the pipes. To repeat the ignition procedure press release button 

2

 (see fig.1 pag. 9) and then try the ignition 

procedure once again. If the boiler does not start, press the reset button 2 (see fig. 1 pag. 9). 

IMPORTANT 

should the boiler 

fail to ignite 

wait 3 minutes 

before pressing button again.  

• 

turn selector switch 

1

 to the «off» position (see fig. 1 pag. 9), insert a gauge into the pressure point (see fig. 4 pag. 12; pos. 

no. 4), turn on the boiler and check the minimum and maximum calibration pressures of the modulator in accordance with 
those stated on the  gas plate; (to check the maximum modulation pressure of the modulator, turn on a hot water tap and 

check that the maximum pressure is equal to that stated on the plate; to check the minimum, undo one wire from the 

modulator coil and check on the gauge that the minimum pressure is equal to that stated on the plate; if the maximum 

pressure is not the same as stated on the plate, calibrate the modulator again; 

• 

once the calibration procedure has been completed, unplug the mains lead or turn off the mains switch, close the gas cock 
and remove the gauge from the pressure point; tighten the screw making sure there are no gas leaks; 

• 

after carrying out this operation, return the panel to its correct position and put the front casing back. 

CHECK 

the maximum heating power. 

For procedure regarding regulation of the heating system thermal capacity 

see «BOILER ADJUSTMENTS». 

 

EMPTYING THE CENTRAL HEATING SYSTEM 

Whenever it is necessary to empty the system, proceed as follows: 

• 

turn off the main power supply switch; 

• 

wait for the boiler to cool down; 

turn the system drain tap 

RS

 (see fig. 5 pag. 9) and use a container to collect the water that runs out; 

 

EMPTYING THE DOMESTIC HOT WATER SYSTEM 

Whenever there is danger of freezing, the hot water system should be emptied in the following way: 

• 

shut off the water at the mains; 

• 

open all hot and cold water taps; 

• 

empty from the lowest point (where possible). 

 

WARNING 

Please ensure that the boiler in commissioned in line with all BENCHMARK BOOKLET REQUIREMENTS. Failure to do this 

may in validate the guarentee.

Summary of Contents for RSF 24 E

Page 1: ...LISH Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RSF 20 E RSF 24 E TYPE C R...

Page 2: ......

Page 3: ...4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 16 17 BOILER CONTROL PANEL page 8 STARTING UP THE BOILER FOR THE FIRST TIME page 9 BOILER ADJUSTMENTS page 11 GAS TYPE CONVERSION page 12 REG...

Page 4: ...expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be perfor...

Page 5: ...w 11 15 BTU h 37498 51187 Heating temperature adjustment C 30 80 30 80 Max working pressure heating bar 3 3 Min working pressure heating bar 0 3 0 3 Expansion vessel capacity initial pressure 1 bar Li...

Page 6: ...aust into a flue duct and the air intake directly from an external wall To insert a bend reduce total flue length by 1 5 m R RETURN G GAS C HOT WATER F COLD WATER A HEATING FLOW NOTE USE ORIGINAL RADI...

Page 7: ...8 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the above...

Page 8: ...d Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose designed...

Page 9: ...d to the heating system with the fittings supplied with the boiler JIG Connect pipes and valves as shown in the picture 5 Position the boiler paying attention to hang it to the hanging bracket do not...

Page 10: ...or and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must be fitted NOTE The frost system will onl...

Page 11: ...nd open the electrical control box by lifting the cover as shown in fig 1 E With the electrical control box now open make the following connections Connect the yellow green wire to the terminal marked...

Page 12: ...eaks The checking procedure for the gas burner attachment is carried out with the boiler working make sure the electrical mains switch is OFF remove the front cover by pulling it forwards undo the sid...

Page 13: ...pressure is equal to that stated on the plate to check the minimum undo one wire from the modulator coil and check on the gauge that the minimum pressure is equal to that stated on the plate if the m...

Page 14: ...ll screwdriver for any adjustments Turn clockwise to increase gas pressure to the burner at start up by setting the trimmer to maximum calibration pressure of modulator see page 16 Turn counter clockw...

Page 15: ...replace it with the new one supplied in the conversion kit g calibrate the new max and min settings for the modulator DATA TABLE Models RSF 20 E NATURAL GAS G 20 LIQUID BUTAN GAS G 30 LIQUID PROPANE...

Page 16: ...de out the coil 1 located above the gas valve Fig D Tighten plastic screw 3 by turning it clockwise be careful not to break it Fig E Use a no 17 spanner to undo the lock nut 5 which holds the core 4 o...

Page 17: ...lve body following instructions from no 1 to no 4 see fig 1 To separate the motor from the valve body proceed as follows 1 Press button A under the motor 2 Simultaneously keep the A button pressed and...

Page 18: ...N CHAMBER 4 ROOM SEALED CHAMBER COVER 5 ROOM SEALED CHAMBER BACK 6 HEAT EXCHANGER Mod 20 000 HEAT EXCHANGER Mod 24 000 7 D H W EXCHANGER H20 H20 PB 21 73 D H W EXCHANGER H20 H20 PB 24 73 8 EXCHANGER A...

Page 19: ...C6 C7 RS1 R58 R22 R21 4 2 1 3 15 14 22 LED2 LED1 LED3 LED4 RAVI II R31 42 R18 R17 yellow blue R48 FA1 C20 R49 R23 R24 R47 C19 C21 red brown R39 C9 M9 R62 R61 R57 J16 R38 C5 J20 R37 41 R16 C14 IC2 J7...

Page 20: ...24 18 22 12 13 12 11 EA 8 ER 6 RPA P 15 PTC2 14 5 20 21 V RVA 16 2 1 3 7 4 PA VD NET FILTER IG R CY CY CX N L AIR PRESSURE SWITCH FAN PUMP RELAY CONTACT D H WATER RELAY CONTACT FAN RELAY CONTACT THER...

Page 21: ...e When dismantling the boiler casing be careful when removing the side panels after having removed the front panel the front panel is removed by undoing the lower and front fixing screws and then remo...

Page 22: ...lace it d change over polarity e make earth connection f fit conversion kit 4 Boiler on temperature rises rapidly and extinguishes flame light 2 fig 1 on a circulation pump burned out or blocked b air...

Page 23: ...24028LA CIRCULATING PUMP MOTOR 9 9 13 96008LA 3 BAR PRESSURE RELIEF VALVE 1 2 9 9 14 59010LA WATER PRESSURE SWITCH 1 8 9 9 15 96030LA AUTOMATIC AIR VENT VALVE 5020 3 8 9 9 16 95011LA 8 LT EXPANSION TA...

Page 24: ...s and illustrations contained in this leaflet have been carefully prepared but we reserve the right to make changes and improvements in our products whitch may affect the accurancy of the information...

Reviews: