background image

Installation Manual 

 

Combi -  cod. 99943NA – November 2002 

 

 

FLUE POSITION 

 
IMPORTANT:  THE FLUE SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE RECOMMENDATIONS CONTAINED IN BS 

5440:1. 
The boiler MUST  be installed so that the terminal is exposed to the external air. 
It is important that the position of the terminal allows free passage of air across it at all times. 

If the terminal discharges into a pathway or passageway check that combustion products will not cause nuisance and that the terminal will 
not obstruct the passageway. 

In certain weather conditions a terminal may emit a plume of steam.  Positions where this would cause a nuisance should be avoided. 
IMPORTANT REQUIREMENT:  The correct dimensional relationship between the terminal and any obstruction, openable window or 
ventilator as shown in Fig 1 pag.7 It is ESSENTIAL TO ENSURE,  in practice, that products of combustion discharging from the terminal 

cannot re-enter the building, or any other adjacent building, through ventilators, windows, doors, other sources of natural air infiltration, or 
forced ventilation/air conditioning systems.  If this should occur, the appliance MUST BE TURNED OFF IMMEDIATELY and the local gas 

region consulted. 
Where the lowest part of the terminal is fitted less than 2m (6.6ft) above a balcony, above ground, or above a flat roof to which people have 
access, the terminal MUST be protected by a purpose designed guard.  

Where the terminal is fitted within 850mm (34in) of a plastic or painted gutter, or 450mm (18in) of painted eaves, an aluminium shield of at 
least 1000 mm (40in)  long should be fitted to the underside of the gutter painted surface. 
The air inlet/products outlet duct and the terminal of the boiler MUST NOT be closer than 25mm (1in) to combustible material.

 

 

 
 
TERMINAL POSITION 

 

J

E

A

G

M

F

F

A

D

H,I

TOP VIEW REAR FLUE

D

G

L

K

G

N

B.C

TERMINAL 
ASSEMBLY

PROPERTY BOUNDARY LINE

300 min

 

 
 

A

  Directly below an openable window, air vent or any other ventilation opening. 

300 mm 

B

  Below gutter, drain pipes or soil pipes. 

25  mm  

C

  Below eaves. 

25  mm  

D

  Below balcony or carport roof. 

25  mm  

E

  From vertical drain pipes or soil pipes. 

25  mm  

F

  From internal or external corners. 

25  mm  

G

  Above adjacent ground, roof or balcony level. 

300  mm  

H

  From a surface facing the terminal. 

600  mm  

I

 

Facing the terminals. 

1200  mm  

J

  From opening (door, window)in the carport into dwelling. 

1200  mm  

K

  Vertically from a terminal on the same wall 

1500  mm  

L

  Horizontally from a terminal on the same wall 

300  mm  

M

  Above an opening, air brick, opening window etc. 

300  mm 

N

  Horizontally to an opening, air brick, opening window etc. 

300  mm 

 

 
 
 

Fig. 1 

Summary of Contents for RSF 24 E

Page 1: ...LISH Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RSF 20 E RSF 24 E TYPE C R...

Page 2: ......

Page 3: ...4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 16 17 BOILER CONTROL PANEL page 8 STARTING UP THE BOILER FOR THE FIRST TIME page 9 BOILER ADJUSTMENTS page 11 GAS TYPE CONVERSION page 12 REG...

Page 4: ...expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be perfor...

Page 5: ...w 11 15 BTU h 37498 51187 Heating temperature adjustment C 30 80 30 80 Max working pressure heating bar 3 3 Min working pressure heating bar 0 3 0 3 Expansion vessel capacity initial pressure 1 bar Li...

Page 6: ...aust into a flue duct and the air intake directly from an external wall To insert a bend reduce total flue length by 1 5 m R RETURN G GAS C HOT WATER F COLD WATER A HEATING FLOW NOTE USE ORIGINAL RADI...

Page 7: ...8 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the above...

Page 8: ...d Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose designed...

Page 9: ...d to the heating system with the fittings supplied with the boiler JIG Connect pipes and valves as shown in the picture 5 Position the boiler paying attention to hang it to the hanging bracket do not...

Page 10: ...or and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must be fitted NOTE The frost system will onl...

Page 11: ...nd open the electrical control box by lifting the cover as shown in fig 1 E With the electrical control box now open make the following connections Connect the yellow green wire to the terminal marked...

Page 12: ...eaks The checking procedure for the gas burner attachment is carried out with the boiler working make sure the electrical mains switch is OFF remove the front cover by pulling it forwards undo the sid...

Page 13: ...pressure is equal to that stated on the plate to check the minimum undo one wire from the modulator coil and check on the gauge that the minimum pressure is equal to that stated on the plate if the m...

Page 14: ...ll screwdriver for any adjustments Turn clockwise to increase gas pressure to the burner at start up by setting the trimmer to maximum calibration pressure of modulator see page 16 Turn counter clockw...

Page 15: ...replace it with the new one supplied in the conversion kit g calibrate the new max and min settings for the modulator DATA TABLE Models RSF 20 E NATURAL GAS G 20 LIQUID BUTAN GAS G 30 LIQUID PROPANE...

Page 16: ...de out the coil 1 located above the gas valve Fig D Tighten plastic screw 3 by turning it clockwise be careful not to break it Fig E Use a no 17 spanner to undo the lock nut 5 which holds the core 4 o...

Page 17: ...lve body following instructions from no 1 to no 4 see fig 1 To separate the motor from the valve body proceed as follows 1 Press button A under the motor 2 Simultaneously keep the A button pressed and...

Page 18: ...N CHAMBER 4 ROOM SEALED CHAMBER COVER 5 ROOM SEALED CHAMBER BACK 6 HEAT EXCHANGER Mod 20 000 HEAT EXCHANGER Mod 24 000 7 D H W EXCHANGER H20 H20 PB 21 73 D H W EXCHANGER H20 H20 PB 24 73 8 EXCHANGER A...

Page 19: ...C6 C7 RS1 R58 R22 R21 4 2 1 3 15 14 22 LED2 LED1 LED3 LED4 RAVI II R31 42 R18 R17 yellow blue R48 FA1 C20 R49 R23 R24 R47 C19 C21 red brown R39 C9 M9 R62 R61 R57 J16 R38 C5 J20 R37 41 R16 C14 IC2 J7...

Page 20: ...24 18 22 12 13 12 11 EA 8 ER 6 RPA P 15 PTC2 14 5 20 21 V RVA 16 2 1 3 7 4 PA VD NET FILTER IG R CY CY CX N L AIR PRESSURE SWITCH FAN PUMP RELAY CONTACT D H WATER RELAY CONTACT FAN RELAY CONTACT THER...

Page 21: ...e When dismantling the boiler casing be careful when removing the side panels after having removed the front panel the front panel is removed by undoing the lower and front fixing screws and then remo...

Page 22: ...lace it d change over polarity e make earth connection f fit conversion kit 4 Boiler on temperature rises rapidly and extinguishes flame light 2 fig 1 on a circulation pump burned out or blocked b air...

Page 23: ...24028LA CIRCULATING PUMP MOTOR 9 9 13 96008LA 3 BAR PRESSURE RELIEF VALVE 1 2 9 9 14 59010LA WATER PRESSURE SWITCH 1 8 9 9 15 96030LA AUTOMATIC AIR VENT VALVE 5020 3 8 9 9 16 95011LA 8 LT EXPANSION TA...

Page 24: ...s and illustrations contained in this leaflet have been carefully prepared but we reserve the right to make changes and improvements in our products whitch may affect the accurancy of the information...

Reviews: