background image

Installation Manual 

 

Combi -  cod. 99943NA – November 2002 

 

 

CONTROL PANEL

 

 

LEGEND 

(see fig. 1)

 

1. 

SUMMER-WINTER ON-OFF SWITCH 

2. 

LOCK-OUT INDICATOR 

3. 

HEATING TEMPERATURE ADJUSTMENT KNOB 

4. 

WATER TEMPERATURE ADJUSTMENT KNOB 

5. 

SPACE FOR ADDING AN OPTIONAL TIMER 

 

SELF- DIAGNOSTIC LEGEND 

(see fig. 2) 

6. 

OPERATING/ POWER INDICATOR 

7. 

DOMESTIC HOT WATER OPERATION 

8. 

HEATING OPERATION  

9. 

FLASHING LIGHT DENOTING AIR PRESSURE SWITCH FAILURE 

10. 

FLASHING LIGHT DENOTING DOMESTIC WATER SENSOR FAILURE  

11. 

FLASHING LIGHT DENOTING HEATING SENSOR FAILURE  

12. 

FLASHING LIGHT DENOTING 90° C MAX TEMPERATURE SENSOR 

FAILURE  

13. 

FLASHING LIGHT DENOTING LACK OF WATER IN SYSTEM 

14. 

WATER PRESSURE LEVEL 1 BAR 

15. 

WATER PRESSURE LEVEL 1.5 BAR 

16. 

ELECTRONIC TEMPERATURE INDICATOR 

 

 

STARTING UP THE BOILER 

After connecting up the water supply, before starting up the boiler, carry 

out the following procedures: 

 

Preliminary procedure 

• 

Do as follows: 

• 

make sure the power supply for the boiler is the same as that stated on 
the plate (230V - 50Hz) and that the live, neutral and earth connections 

have been properly connected; 

• 

make sure the type of gas being supplied is the same as the type for 

which the boiler has been tested and approved (see plate data); 

• 

make sure the unit is properly earthed; 

• 

make sure there are no flammable liquids or materials in the immediate 

vicinity of the boiler; 

• 

make sure that any shut-off valves in the heating circuit are open; 

• 

open the gas cock and check the gas seals, making sure the counter 
shows no sign of leaks; in any case, double check by using a soapy 

solution and eliminate all eventual leaks. The checking procedure for 

the gas burner attachment is carried out with the boiler working; 

• 

make sure the electrical mains switch is OFF; 

• 

remove the front cover by pulling it forwards; 

• 

undo the side screws and rotate the panel downwards  

 

Filling the system  

After making sure the gas cock is closed, fill the heating system as follows; 

• 

fill the system until a pressure of 1.5 bar has been reached (light no. 16 ON; see fig. 2) and then close the tap on the filling 

loop; 

• 

make sure the cap on the auto air vent valve is slightly loose to allow air to escape from the system (see fig. 1); 

• 

undo the cap on the circulation pump to eliminate any eventual air locks (see fig. 3). Undo the valve on the heat exchanger 
and then close it again as soon as water appears (see fig. 4); it is a good idea to purge all radiators of air at this point too; 

• 

before starting up the boiler the water pressure must be checked again; if this is seen to be below 0.5 bar (light no. 13; see 

fig. 2), bring it back up to 1.5 bar (light no. 15 ON; see fig. 2) 

and

 

close the tap on the filling loop;

 

• 

 

switch on the electrical power supply to the boiler; 

• 

turn selector switch 

1

 to the WINTER 

7

 

position (see fig. 1), after a few seconds the pump will come into action; 

• 

once the boiler is working, if any noises are heard in the system, repeat the above air purging procedures until there is no air 
left in the system; 

• 

turn on a hot water tap briefly; 

• 

if any noises are heard, loosen the valve on the heat exchanger (see fig.4) and close it again as soon as water appears; 

• 

check there are no obstructions in the exhaust duct; 

 

AIR VENT VALVE

AIR VENT VALVE CAP

CIRCULATING PUMP

VALVE

EXCHANGER

D.H.W.

PUMP CAP

EXCHANGER

RS

Fig. 3 

Fig. 5 

ELECTRONIC WATER

PRESSURE GAUGE

SELF-DIAGNOSTIC

14

16

10

6

7

8

9

11

12

13

15

5

2

3

1

4

Fig. 1 

Fig. 2 

Fig. 4 

Summary of Contents for RSF 24 E

Page 1: ...LISH Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RSF 20 E RSF 24 E TYPE C R...

Page 2: ......

Page 3: ...4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 16 17 BOILER CONTROL PANEL page 8 STARTING UP THE BOILER FOR THE FIRST TIME page 9 BOILER ADJUSTMENTS page 11 GAS TYPE CONVERSION page 12 REG...

Page 4: ...expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be perfor...

Page 5: ...w 11 15 BTU h 37498 51187 Heating temperature adjustment C 30 80 30 80 Max working pressure heating bar 3 3 Min working pressure heating bar 0 3 0 3 Expansion vessel capacity initial pressure 1 bar Li...

Page 6: ...aust into a flue duct and the air intake directly from an external wall To insert a bend reduce total flue length by 1 5 m R RETURN G GAS C HOT WATER F COLD WATER A HEATING FLOW NOTE USE ORIGINAL RADI...

Page 7: ...8 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the above...

Page 8: ...d Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose designed...

Page 9: ...d to the heating system with the fittings supplied with the boiler JIG Connect pipes and valves as shown in the picture 5 Position the boiler paying attention to hang it to the hanging bracket do not...

Page 10: ...or and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must be fitted NOTE The frost system will onl...

Page 11: ...nd open the electrical control box by lifting the cover as shown in fig 1 E With the electrical control box now open make the following connections Connect the yellow green wire to the terminal marked...

Page 12: ...eaks The checking procedure for the gas burner attachment is carried out with the boiler working make sure the electrical mains switch is OFF remove the front cover by pulling it forwards undo the sid...

Page 13: ...pressure is equal to that stated on the plate to check the minimum undo one wire from the modulator coil and check on the gauge that the minimum pressure is equal to that stated on the plate if the m...

Page 14: ...ll screwdriver for any adjustments Turn clockwise to increase gas pressure to the burner at start up by setting the trimmer to maximum calibration pressure of modulator see page 16 Turn counter clockw...

Page 15: ...replace it with the new one supplied in the conversion kit g calibrate the new max and min settings for the modulator DATA TABLE Models RSF 20 E NATURAL GAS G 20 LIQUID BUTAN GAS G 30 LIQUID PROPANE...

Page 16: ...de out the coil 1 located above the gas valve Fig D Tighten plastic screw 3 by turning it clockwise be careful not to break it Fig E Use a no 17 spanner to undo the lock nut 5 which holds the core 4 o...

Page 17: ...lve body following instructions from no 1 to no 4 see fig 1 To separate the motor from the valve body proceed as follows 1 Press button A under the motor 2 Simultaneously keep the A button pressed and...

Page 18: ...N CHAMBER 4 ROOM SEALED CHAMBER COVER 5 ROOM SEALED CHAMBER BACK 6 HEAT EXCHANGER Mod 20 000 HEAT EXCHANGER Mod 24 000 7 D H W EXCHANGER H20 H20 PB 21 73 D H W EXCHANGER H20 H20 PB 24 73 8 EXCHANGER A...

Page 19: ...C6 C7 RS1 R58 R22 R21 4 2 1 3 15 14 22 LED2 LED1 LED3 LED4 RAVI II R31 42 R18 R17 yellow blue R48 FA1 C20 R49 R23 R24 R47 C19 C21 red brown R39 C9 M9 R62 R61 R57 J16 R38 C5 J20 R37 41 R16 C14 IC2 J7...

Page 20: ...24 18 22 12 13 12 11 EA 8 ER 6 RPA P 15 PTC2 14 5 20 21 V RVA 16 2 1 3 7 4 PA VD NET FILTER IG R CY CY CX N L AIR PRESSURE SWITCH FAN PUMP RELAY CONTACT D H WATER RELAY CONTACT FAN RELAY CONTACT THER...

Page 21: ...e When dismantling the boiler casing be careful when removing the side panels after having removed the front panel the front panel is removed by undoing the lower and front fixing screws and then remo...

Page 22: ...lace it d change over polarity e make earth connection f fit conversion kit 4 Boiler on temperature rises rapidly and extinguishes flame light 2 fig 1 on a circulation pump burned out or blocked b air...

Page 23: ...24028LA CIRCULATING PUMP MOTOR 9 9 13 96008LA 3 BAR PRESSURE RELIEF VALVE 1 2 9 9 14 59010LA WATER PRESSURE SWITCH 1 8 9 9 15 96030LA AUTOMATIC AIR VENT VALVE 5020 3 8 9 9 16 95011LA 8 LT EXPANSION TA...

Page 24: ...s and illustrations contained in this leaflet have been carefully prepared but we reserve the right to make changes and improvements in our products whitch may affect the accurancy of the information...

Reviews: