background image

Installation Manual 

 

Combi -  cod. 99943NA – November 2002 

 

 

THE FRIENDLY POWER OF HEAT 

 

Thank you for choosing RADIANT 
 

Declaration for purposes of Art. 7 of Law 46 of 5 April 1990. 

RADIANT BRUCIATORI S.p.A. hereby declares that all of its products are constructed to industry standards as required by the Article in question and by 
Article 5 of the law in effect (D.P.R. no. 447/97). 
 

RADIANT BRUCIATORI S.p.A.

 products are type tested 

EC.

 

 
All 

RADIANT

 boilers are constructed according to UNI - CIG 

(EC)

 norms. The materials used, such as copper, brass, and stainless steel form a compact, 

homogeneous, highly functional unit that is easy to install and simple to operate. The wall-mounted boiler is equipped with all of the approved accessories 
required to make it a true, independent heating plant for home heating and for the production of hot water for domestic needs. All boilers are fully inspected, 
and come with a certificate of quality signed by the inspector and with a warranty certificate. This booklet must be read carefully and stored in a safe place, 
accompanying the boiler at all times

 
RADIANT BRUCIATORI S.p.A. declines any and all responsibility for misinterpretations of this booklet deriving from any translations of same. 
RADIANT BRUCIATORI S.p.A. will not be responsible for non-observance of the instructions contained in this booklet or for the consequences of 
any action not specifically described herein.

 

 

INSTALLATION INSTRUCTIONS  - WARNINGS  

 

THIS INSTALLATION, USE, AND MAINTENANCE MANUAL IS AN ESSENTIAL AND INTEGRAL PART OF THE PRODUCT, AND MUST ALWAYS BE KEPT NEAR THE DEVICE. 

THE WARNINGS CONTAINED IN THIS SECTION ARE ADDRESSED BOTH TO THE USER AND TO INSTALLATION AND MAINTENANCE PERSONNEL. 

THE USER WILL FIND INFORMATION ON OPERATION AND LIMITS OF USE IN THE ACCOMPANYING MANUAL, WHICH SHOULD BE READ VERY CAREFULLY. 
STORE THE MANUAL CAREFULLY FOR FUTURE REFERENCE

 
1) GENERAL WARNINGS  
INSTALLATION MUST BE PERFORMED IN OBSERVANCE OF CURRENT NORMS, ACCORDING TO THE CONSTRUCTOR’S INSTRUCTIONS, AND BY PROFESSIONALLY QUALIFIED PERSONNEL. 
THE INSTALLATION INSTRUCTIONS MANUAL MUST BE ALWAYS ACCOMPANY THE BOILER. 
PROFESSIONALLY QUALIFIED PERSONNEL ARE THOSE HAVING TECHNICAL COMPETENCE IN THE SECTOR OF APPLICATION OF THE DEVICE (CIVIL OR INDUSTRIAL), AND, IN PARTICULAR, THE 

CONSTRUCTOR’S AUTHORISED SERVICE CENTRES. 
INCORRECT INSTALLATION MAY CAUSE DAMAGE TO PERSONS, ANIMALS, OR PROPERTY, FOR WHICH THE CONSTRUCTOR ASSUMES NO LIABILITY. 

• 

After completely removing the packing, make sure that the contents are in perfect condition. 

• 

In case of doubt, do not use the equipment. Consult the supplier. 

• 

Packing materials (cardboard carton, wooden crate, nails, clips, plastic bags, polystyrene, etc.) are potentially dangerous and must be kept away from children. 

• 

Before performing any cleaning or maintenance operation, turn off the unit by means of the mains switch and/or by means of the appropriate cut-off devices. 

• 

Do not block the air intake or heat dissipation grates. 

• 

In the event of breakdown and/or poor functioning of the device, turn it off and do not attempt to repair it or take any direct action. Refer to professionally qualified personnel only. 

• 

Any repairs must be performed exclusively by a service centre authorised by the constructor, and with original spare parts only. 

• 

Non-observance of the above instruction may compromise the safety of the device. To guarantee efficient and correct operation, the device should undergo period maintenance by professionally qualified personnel according to 

the constructor’s instructions. 

• 

Whenever the device is to be put out of service, secure all potentially hazardous parts to prevent accidents or damage. 

• 

If the device is sold or transferred to another owner, or if you move and leave the boiler, make sure that this booklet stays with the boiler so that it may be consulted by the new owner and/or by the installer. 

• 

Use only original spare parts for all devices with optionals or kits (including electrical ones). 

 

WARNING

: this device must be used for its intended purpose, i.e., heating and production of domestic hot water. Any other use is improper and therefore dangerous. The constructor will have no contractual or extracontractual liability 

for damage caused by incorrect installation and/or use or by non-observance of instructions supplied by the constructor. 
 

This device must be used exclusively with a sealed central heating system equipped with an expansion vessel. 

 

2) WARNINGS REGARDING INSTALLATION

 

Warranty expires 

12 months from date of installation and in all cases no later than 18 months from date of construction

. First start-up must be performed by 

authorised personnel only

. For any operation on the hydraulic, gas, 

or electrical circuit regarding the heating unit, refer to 

authorised technicians only

 

and use original spare parts only

. Wall-mounted boilers are not to be installed in damp rooms, and must be protected against sprays or jets of water 

or other liquids to prevent malfunctions of the electrical and heating devices. They must not be exposed to direct steam from cookers, and nothing must be placed on top of them. This heating unit has been constructed to heat the home 

and to produce hot water. 

The constructor declines all responsibility for incorrect installation and/or use of the device.

 Do not leave the device on when it is not being used: 

close the gas cock and turn off the mains switch

. If 

you smell gas in the room in which the device is installed, do not operate any electrical switches, telephones, or any other device that might cause a spark. Immediately open doors and windows to create an air current to clear the room. 

Close the main gas cock (at the meter) or the cylinder cock, and request immediate technical service. 

Do not tamper with the device. 

 

SYSTEMS WITH THERMOSTATS 

 

A by-pass must be installed in heating systems with radiators thermostats. 

As required by current norms, these devices must be installed by 

qualified personnel only

, who must respect norms 

UNI-CIG 7129 and 7131

 and revisions, fire department regulations, and requirements of the local gas company. 

Before installing the boiler, make sure that the water and heating systems are compatible with its output. The room must be properly ventilated by means of an air intake (see UNI 7129/92 and UNI 7129/95 FA). 

The air intake must be at floor level open flue only, at a point where it cannot be obstructed, and protected by a grate that does not reduce the useful section of flow. 

The use of air flows from adjacent rooms is permitted as long as such rooms are in depression with respect to the outside and as long as there are 

no wood-burning fireplaces or fans

 installed there. If the boiler is to be installed 

externally (for example, on balconies or terraces), make sure that it is protected against atmospheric agents to prevent damage to components and voiding of the warranty. In such cases we recommend building a heat compartment to 

protect the boiler against inclement weather. 

Check the technical data on the packing and on the plate

 located inside the front casing. Check that the burner is suitable for use with the type of gas available. 

Make sure that all pipes and connections are perfectly sealed and that there are no gas leaks.

 

All pipework should be chemically flushed to remove any residues that might negative effect the operation of the boiler. 
 

3) GENERAL WARNINGS BASED ON TYPE OF POWER SUPPLY 

POWER  SUPPLY           

    

Electrical safety is achieved only when the device is correctly and efficiently earthed as per current safety norms (IEC 64-8 Electrical Part). 

• 

This fundamental safety requirement must be checked. In case of doubt, request a check of the electrical system by professionally qualified personnel. The constructor will not be liable for any damage caused by lack of or 

improper earthing of the system. 

• 

Have professionally qualified personnel check that the electrical system is adequate for the maximum absorbed power of the device (indicated on the plate). In particular, make sure that the section of the system wires is 

suitable for the maximum absorbed power of the device. 

• 

Do not use adapters, multiple sockets, and/or extension cords to power the device from the electrical mains. 

• 

Provide a unipolar switch as required by current safety regulations to connect the device to the mains. 

• 

The use of any electrical device requires the observance of some fundamental rules, such as: 

• 

do not touch the device with wet or damp parts of the body and/or with bare feet 

• 

do not pull on electrical cables 

• 

do not expose the device to atmospheric agents (rain, sun, etc.) unless specifically provided for 

• 

do not allow the device to be used by children or anyone unfamiliar with its operation 

• 

The power cable must not be replaced by the user. 

• 

If the cable becomes damaged, turn off the device and have the cable replaced by professionally qualified personnel only. 

• 

If you decide not to use the device for an extended length of time, turn off the mains switch that feeds all components of the system using electrical energy (pumps, burner, etc.).

 

Summary of Contents for RSF 24 E

Page 1: ...LISH Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RSF 20 E RSF 24 E TYPE C R...

Page 2: ......

Page 3: ...4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 16 17 BOILER CONTROL PANEL page 8 STARTING UP THE BOILER FOR THE FIRST TIME page 9 BOILER ADJUSTMENTS page 11 GAS TYPE CONVERSION page 12 REG...

Page 4: ...expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be perfor...

Page 5: ...w 11 15 BTU h 37498 51187 Heating temperature adjustment C 30 80 30 80 Max working pressure heating bar 3 3 Min working pressure heating bar 0 3 0 3 Expansion vessel capacity initial pressure 1 bar Li...

Page 6: ...aust into a flue duct and the air intake directly from an external wall To insert a bend reduce total flue length by 1 5 m R RETURN G GAS C HOT WATER F COLD WATER A HEATING FLOW NOTE USE ORIGINAL RADI...

Page 7: ...8 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the above...

Page 8: ...d Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose designed...

Page 9: ...d to the heating system with the fittings supplied with the boiler JIG Connect pipes and valves as shown in the picture 5 Position the boiler paying attention to hang it to the hanging bracket do not...

Page 10: ...or and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must be fitted NOTE The frost system will onl...

Page 11: ...nd open the electrical control box by lifting the cover as shown in fig 1 E With the electrical control box now open make the following connections Connect the yellow green wire to the terminal marked...

Page 12: ...eaks The checking procedure for the gas burner attachment is carried out with the boiler working make sure the electrical mains switch is OFF remove the front cover by pulling it forwards undo the sid...

Page 13: ...pressure is equal to that stated on the plate to check the minimum undo one wire from the modulator coil and check on the gauge that the minimum pressure is equal to that stated on the plate if the m...

Page 14: ...ll screwdriver for any adjustments Turn clockwise to increase gas pressure to the burner at start up by setting the trimmer to maximum calibration pressure of modulator see page 16 Turn counter clockw...

Page 15: ...replace it with the new one supplied in the conversion kit g calibrate the new max and min settings for the modulator DATA TABLE Models RSF 20 E NATURAL GAS G 20 LIQUID BUTAN GAS G 30 LIQUID PROPANE...

Page 16: ...de out the coil 1 located above the gas valve Fig D Tighten plastic screw 3 by turning it clockwise be careful not to break it Fig E Use a no 17 spanner to undo the lock nut 5 which holds the core 4 o...

Page 17: ...lve body following instructions from no 1 to no 4 see fig 1 To separate the motor from the valve body proceed as follows 1 Press button A under the motor 2 Simultaneously keep the A button pressed and...

Page 18: ...N CHAMBER 4 ROOM SEALED CHAMBER COVER 5 ROOM SEALED CHAMBER BACK 6 HEAT EXCHANGER Mod 20 000 HEAT EXCHANGER Mod 24 000 7 D H W EXCHANGER H20 H20 PB 21 73 D H W EXCHANGER H20 H20 PB 24 73 8 EXCHANGER A...

Page 19: ...C6 C7 RS1 R58 R22 R21 4 2 1 3 15 14 22 LED2 LED1 LED3 LED4 RAVI II R31 42 R18 R17 yellow blue R48 FA1 C20 R49 R23 R24 R47 C19 C21 red brown R39 C9 M9 R62 R61 R57 J16 R38 C5 J20 R37 41 R16 C14 IC2 J7...

Page 20: ...24 18 22 12 13 12 11 EA 8 ER 6 RPA P 15 PTC2 14 5 20 21 V RVA 16 2 1 3 7 4 PA VD NET FILTER IG R CY CY CX N L AIR PRESSURE SWITCH FAN PUMP RELAY CONTACT D H WATER RELAY CONTACT FAN RELAY CONTACT THER...

Page 21: ...e When dismantling the boiler casing be careful when removing the side panels after having removed the front panel the front panel is removed by undoing the lower and front fixing screws and then remo...

Page 22: ...lace it d change over polarity e make earth connection f fit conversion kit 4 Boiler on temperature rises rapidly and extinguishes flame light 2 fig 1 on a circulation pump burned out or blocked b air...

Page 23: ...24028LA CIRCULATING PUMP MOTOR 9 9 13 96008LA 3 BAR PRESSURE RELIEF VALVE 1 2 9 9 14 59010LA WATER PRESSURE SWITCH 1 8 9 9 15 96030LA AUTOMATIC AIR VENT VALVE 5020 3 8 9 9 16 95011LA 8 LT EXPANSION TA...

Page 24: ...s and illustrations contained in this leaflet have been carefully prepared but we reserve the right to make changes and improvements in our products whitch may affect the accurancy of the information...

Reviews: