INSTALLATION INSTRUCTIONS
RK 100 - RAD - ING - MAN.INST - 1311.1 - DIGITECH CS MIAH4
16
B
C
A
3.3 Boiler room – Installation requirements
Please refer to local and national standards in force in the Country of destination of the product. In particular the
manufacturer recommends:
For the creation of a technical protected place, in order to allow access to all the safety devices and for
maintenance purposes, it is important that minimum distances are respected.
The boiler can be installed externally, in a partially protected place in conformity with local Building
Regulations and if the outside minimum temperature is not lower than –10°C, by assuring electrical and gas
supply to the boiler.
3.4 Unpacking
■
The materials (cardboard) used for packing the appliance are fully recyclable.
■
It is recommended that the packing material is only removed prior to installing the boiler. The
manufacturer will not be held responsible for damage caused by incorrect storage of the product.
■
Packing materials (plastic bags, polystyrene, nails, etc.) must not be left within reach of children, in that
these items represent a potential hazard.
A.
Place the packed
appliance on the floor (see
fig. 1) making sure that the
"up” arrow is facing down.
Remove the staples and
open out the four flaps of
the box.
B.
Rotate the boiler 90° while
manually supporting it from
underneath
C.
Lift the box and remove
the protections. Lift the
boiler by grasping the rear
part and proceed with the
installation.
STORAGE & HANDLING
Please note that prior to
installation the Radiant boilers
should be stored in the
horizontal position with no
more than three boilers to a
stack;
Ensure that the boilers are
stored in dry conditions and
be aware that the carton is a
tow-man lift;
Fig. 1