
22
Installation of the Rada Pulse Control Box
plug-in connections
to solenoid Valves
plug-in connections
to pulse sensors
Transformer
pcb
cover screws
cover
connections to auxiliary units
e.g. fan, light , disinfection
(refer to section:
'Description,
4. Accessories, 4.1 Rada Pulse
Relay Box'
)
connection to mains
power supply
7.
connect the transformer to the mains electrical supply.
8.
The control box will now require commissioning, refer to section:
'Commissioning
/ Programming'
. factory setting is 'showers on' for 30 seconds).
connection to hand
held programmer