30
5)
TEST WIRING! Test input wiring by manipulating the state of inputs and verifying that
the corresponding Channel LED activates when the input is closed (and deactivates
when the input is open).
NOTES:
Dry (non-powered) contact inputs only!
To use Channels 9 or 10 as analog inputs, see separate diagram.
Ground connection is important for surge protection.
Terminals accommodate #16 to #26 wire size.
WIRING INSTRUCTIONS:
1)
Turn RTU on, and Disarm it (so that the right hand Arm/Disarm LED blinks).
2)
Connect input wiring as needed per the above diagram.
3)
Place all inputs in their normal, non-alarm state. Press the ACCEPT pushbutton. This
automatically configures inputs to alarm on the opposite input state.
4)
If any inputs are to be non-alarming, after using the Accept pushbutton, configure those
inputs as Status-Only via the web site.
Summary of Contents for AlarmAgent.com AA-102DC
Page 1: ...RACO MANUFACTURING ENGINEERING COMPANY AA RTU Installation Manual v3 2...
Page 6: ...5...
Page 7: ...6 RTU Interior View...
Page 34: ...33 Solar Power Mode Wiring Diagram...
Page 35: ...34...
Page 36: ...35...
Page 37: ...36...
Page 40: ......
Page 41: ...40 Appendix G AlarmAgentTM RTU Digital Upgrade Field Wiring Worksheets...
Page 42: ...41...