Instruction book
2012 2039 28
103
5.3 Starting
Procedure
For the position of the air outlet and the drain connections, see sections Introduction.
Control panel
1. Open the air outlet valve.
2. Switch on the voltage. Check that voltage on LED (8) lights up.
3. Press start button (14) on the control panel. The compressor starts running and the automatic operation LED
(7) lights up. After the start-up cycle, the compressor starts running loaded.
5.4 During
operation
The operator must apply all relevant
Safety precautions
. Also consult section
Problem
solving.
Keep the doors closed during operation; they may be opened for short periods only to
carry out checks
When the motors are stopped and LED (7) (automatic operation) is a light, the motors
may start automatically
Summary of Contents for QGV 40
Page 2: ......
Page 16: ...Instruction book 2012 2039 28 16 Main components Main components...
Page 128: ...Instruction book 2012 2039 28 128 Appendix 1 Product Analysis Report...
Page 131: ......