Instruction book
2012 2039 28
101
Reference
Description
OL1
Overload Relay (Drive Motor)
OL4
Overload Disconnect (Fan Motor)
CPT1
Control Power Transformer
5. Fit the air outlet (AV); see section Introduction for the position of the valve. Close the valve
Connect the air net to the valve.
6. Check the fluid level.
3 to 5 minutes after stopping, the fluid level should be between the top of the sight glass (GI) and the filling
point (FC).
Position of oil level sight-glass
7.
If applicable: provide labels, warning the operator that
:
The compressor may automatically restart after voltage failure.
8. Check the voltage between the three phases before using the unit for the first time
Summary of Contents for QGV 40
Page 2: ......
Page 16: ...Instruction book 2012 2039 28 16 Main components Main components...
Page 128: ...Instruction book 2012 2039 28 128 Appendix 1 Product Analysis Report...
Page 131: ......