Q2 Plans - Chapter 4 - Page 4-01
INDIVIDUAL PART CONSTRUCTION
INTRODUCTION
.....
The first task in the construction of your Q2 is to make many
of the small, individual parts required for assembly later. Quickie
Aircraft Corporation has found that making these parts at one time is
most efficient and will also give the builder a chance to gain
experience working with his hands on small pieces that can be easily
remade.
.....
The parts include templates that are used for jigging and
rigging various portions of your aircraft. Drawings are provided
within this chapter, but primarily the templates are provided in a
series of large Appendix drawings included with these plans. All
templates are printed full size.
.....
Jigging and rigging templates should be constructed from
material such as hardboard, plywood, or masonite of 1/4" thickness.
Aircraft quality materials are not required. The hot-wiring templates
for the main wing, canard, and vertical fin, as well as the control
surfaces, should be made out of thin aluminum, masonite, or aircraft
quality plywood. These templates must be smooth and wave free, so
spend considerable time on each one and sight frequently along the
line to check for waves or notches. Any wave or notch will be
reflected directly in the shape of your wing, etc. and will be
difficult and heavy to correct later on; so do a good job in the
beginning.
.....
Template drawings provided for parts made as a sandwich
composite (glass-foam-glass) should still be made on the hardboard,
plywood, or masonite of 1/4" thickness. It will be much easier to
transfer the complicated curves and lines to the actual part if you
have a material more durable than heavy paper.
.....
The phonolic bearing block comes delivered to you with all of
the important precision holes already drilled and reamed to the
proper size. The remaining holes are for bonding strength and are
non-critical on a precise diameter and position.
.....
Be sure to identify and number each template and part so that it
can be identified easily later when it is needed. Further, group all
parts of the same family (e.g. Control System (CS), fuselage female
jigging templates, etc.) together.
.....
The drawings may be glued directly onto the material with
Contact Cement. Be careful, however, that you do not paste up the
drawings crooked. Smooth out all ripples before the glue sets. Do not
use a glue that will cause excessive shrinkish.
.....
The drawings are reproduced to within 1% accuracy; in most
cases, the accuracy is closer to 0.1%. However, in the final
analysis, you must build your aircraft and allow for tolerances and
errors during construction. Therefore, you may expect not all
templates to fit exactly as the drawings indicate. Large differences,
however, are reason to check thoroughly on your previous work to see
if you have followed the plans exactly.
.....
One last comment; we have replacement copies of all of the
Summary of Contents for Q2 Lite
Page 10: ...Q2 Plans Appendix Page v Q2 Plans Chapter 1 Page 1 1...
Page 17: ...Q2 Plans Chapter 1 Page 1 3...
Page 18: ......
Page 25: ...CONTINUED ON NEXT PAGE PAGE 3 1 Q2 Plans Chapter 3 Page 3 02...
Page 29: ...CONTINUED ON NEXT PAGE...
Page 70: ...CONTINUED ON NEXT PAGE PAGE 3 15 Q2 Plans Chapter 3 Page 3 16...
Page 71: ......
Page 72: ......
Page 74: ...CONTINUED ON NEXT PAGE PAGE 3 16 Q2 Plans Chapter 3 Page 3 17...
Page 115: ...Q2 Plans Chapter 6 Page 6 02...
Page 123: ...END OF CHAPTER PAGE 7 2 Q2 Plans Chapter 8 Page 8 01...
Page 127: ...CONTINUED ON NEXT PAGE PAGE 8 2 Q2 Plans Chapter 8 Page 8 03...
Page 134: ...END OF CHAPTER PAGE 8 5...
Page 136: ...NOTE See Bottom and Top Main Wing Lamination Drawing for exact sizing of sparcaps A thru M...
Page 137: ...CONTINUED ON NEXT PAGE PAGE 9 1 Q2 Plans Chapter 9 Page 9 02...
Page 138: ...CONTINUED ON NEXT PAGE PAGE 9 2 Q2 Plans Chapter 9 Page 9 03...
Page 154: ...CONTINUED ON NEXT PAGE PAGE 9 8 Q2 Plans Chapter 9 Page 9 09...
Page 155: ......
Page 161: ...PAGE 10 2 Q2 Plans Chapter 10 Page 10 03 PAGE 10 3...
Page 167: ...PAGE 10 5...
Page 174: ......
Page 176: ...CONTINUED ON NEXT PAGE PAGE 10 9 Q2 Plans Chapter 10 Page 10 10...
Page 185: ...PAGE 11 2...
Page 187: ...CONTINUED ON NEXT PAGE PAGE 11 3...
Page 192: ...CONTINUED ON NEXT PAGE PAGE 11 5...
Page 196: ...PAGE 12 1...
Page 198: ......
Page 199: ......
Page 200: ...PAGE 12 2...
Page 206: ...PAGE 13 1 Q2 Plans Chapter 13 Page 13 02...
Page 209: ...PAGE 13 2 Q2 Plans Chapter 13 Page 13 03...
Page 211: ......
Page 212: ......
Page 213: ...PAGE 13 3...
Page 216: ...END OF CHAPTER PAGE 13 4...
Page 221: ...PAGE 14 2 Q2 Plans Chapter 14 Page 14 03...
Page 225: ......
Page 227: ...CONTINUED ON NEXT PAGE PAGE 14 4 Q2 Plans Chapter 14 Page 14 05...
Page 230: ...CONTINUED ON NEXT PAGE PAGE 14 5 Q2 Plans Chapter 14 Page 14 06...
Page 237: ......
Page 238: ...CONTINUED ON NEXT PAGE PAGE 14 8...
Page 240: ...PAGE 14 9...
Page 242: ......
Page 243: ...PAGE 14 10...
Page 246: ...PAGE 15 1 Q2 Plans Chapter 15 Page 15 02...
Page 249: ...END OF CHAPTER PAGE 15 2 Q2 Plans Chapter 16 Page 16 01 ENGINE INSTALLATION...
Page 254: ...PAGE 16 2 Q2 Plans Chapter 16 Page 16 03...
Page 257: ......
Page 258: ...PAGE 16 3 Q2 Plans Chapter 16 Page 16 04...
Page 263: ......
Page 264: ...PAGE 16 5 Q2 Plans Chapter 16 Page 16 06...
Page 266: ......
Page 272: ......
Page 273: ...PAGE 17 2...
Page 276: ...END OF CHAPTER PAGE 17 3...
Page 279: ...END OF CHAPTER PAGE 18 1...
Page 284: ......
Page 286: ......
Page 288: ......
Page 295: ...Congratulations on completing your very own Q2 PAGE 20 4...
Page 296: ...Q2 Plans Chapter 20 Page 20 05...
Page 297: ......
Page 299: ......