16.3". Also measure the width between the two points that you took
the measurements at.
.....
You are now ready to transfer the information onto the main wing
foam cores with a felt tipped marker pen. Using the main wing shear
web and the BL00 foam core joint as the reference mark the two points
on the foam cores, and connect them with a line. That line should
represent where the FS78 bulkhead will meet the main wing core.
Verify by making measurements that this line intersects the main wing
leading edge inside the fuselage once the main wing has been mounted.
If it doesn't, then you will have to taper and round the main wing
core area outside the fuselage sides to avoid an ugly looking flat
spot on your main wing. Next, move the line aft about 0.10" to allow
for the glass buildup as you laminate the main wing skins and spar
caps. This second line on the main wing cores is the trim line.
NOTE
.....
All measurements indicated above
should be made along a WL, not along
the contour of the wing.
SHOULDER HARNESS INSERT INSTALLATION
.....
Each shoulder harness is installed in a Y fashion to the lower
main wing. Prior to glassing the bottom of the main wing, the
shoulder harness inserts (2) must be installed.
.....
Find the two 1" square by 3/16" thick mild steel plates provided
(SH1).
.....
Install one of them with flox at about BL9 left, about 2" along
contour (ac) from the trim line, flush to the surface of the main
wing foam core. Install the second SH1 similarly at BL9 right.
PREPARING THE MAIN WING CORES FOR GLASSING
.....
At this point, the main wing cores should be jigged on your
jigging table upside down, 5-minuted and bondo’ed in place, and not
about to move under anything short of an earthquake.
.....
Use a hard block to clean up all joggles, excess micro, and any
bumps on the main wing cores. At BL00, round the joint so that the
glass will flow smoothly across the joint. At the T.E. (shear web),
round the corner so that the glass will flow smoothly down the face
of the shear web.
.....
This is your last chance to determine the shape of your main
Summary of Contents for Q2 Lite
Page 10: ...Q2 Plans Appendix Page v Q2 Plans Chapter 1 Page 1 1...
Page 17: ...Q2 Plans Chapter 1 Page 1 3...
Page 18: ......
Page 25: ...CONTINUED ON NEXT PAGE PAGE 3 1 Q2 Plans Chapter 3 Page 3 02...
Page 29: ...CONTINUED ON NEXT PAGE...
Page 70: ...CONTINUED ON NEXT PAGE PAGE 3 15 Q2 Plans Chapter 3 Page 3 16...
Page 71: ......
Page 72: ......
Page 74: ...CONTINUED ON NEXT PAGE PAGE 3 16 Q2 Plans Chapter 3 Page 3 17...
Page 115: ...Q2 Plans Chapter 6 Page 6 02...
Page 123: ...END OF CHAPTER PAGE 7 2 Q2 Plans Chapter 8 Page 8 01...
Page 127: ...CONTINUED ON NEXT PAGE PAGE 8 2 Q2 Plans Chapter 8 Page 8 03...
Page 134: ...END OF CHAPTER PAGE 8 5...
Page 136: ...NOTE See Bottom and Top Main Wing Lamination Drawing for exact sizing of sparcaps A thru M...
Page 137: ...CONTINUED ON NEXT PAGE PAGE 9 1 Q2 Plans Chapter 9 Page 9 02...
Page 138: ...CONTINUED ON NEXT PAGE PAGE 9 2 Q2 Plans Chapter 9 Page 9 03...
Page 154: ...CONTINUED ON NEXT PAGE PAGE 9 8 Q2 Plans Chapter 9 Page 9 09...
Page 155: ......
Page 161: ...PAGE 10 2 Q2 Plans Chapter 10 Page 10 03 PAGE 10 3...
Page 167: ...PAGE 10 5...
Page 174: ......
Page 176: ...CONTINUED ON NEXT PAGE PAGE 10 9 Q2 Plans Chapter 10 Page 10 10...
Page 185: ...PAGE 11 2...
Page 187: ...CONTINUED ON NEXT PAGE PAGE 11 3...
Page 192: ...CONTINUED ON NEXT PAGE PAGE 11 5...
Page 196: ...PAGE 12 1...
Page 198: ......
Page 199: ......
Page 200: ...PAGE 12 2...
Page 206: ...PAGE 13 1 Q2 Plans Chapter 13 Page 13 02...
Page 209: ...PAGE 13 2 Q2 Plans Chapter 13 Page 13 03...
Page 211: ......
Page 212: ......
Page 213: ...PAGE 13 3...
Page 216: ...END OF CHAPTER PAGE 13 4...
Page 221: ...PAGE 14 2 Q2 Plans Chapter 14 Page 14 03...
Page 225: ......
Page 227: ...CONTINUED ON NEXT PAGE PAGE 14 4 Q2 Plans Chapter 14 Page 14 05...
Page 230: ...CONTINUED ON NEXT PAGE PAGE 14 5 Q2 Plans Chapter 14 Page 14 06...
Page 237: ......
Page 238: ...CONTINUED ON NEXT PAGE PAGE 14 8...
Page 240: ...PAGE 14 9...
Page 242: ......
Page 243: ...PAGE 14 10...
Page 246: ...PAGE 15 1 Q2 Plans Chapter 15 Page 15 02...
Page 249: ...END OF CHAPTER PAGE 15 2 Q2 Plans Chapter 16 Page 16 01 ENGINE INSTALLATION...
Page 254: ...PAGE 16 2 Q2 Plans Chapter 16 Page 16 03...
Page 257: ......
Page 258: ...PAGE 16 3 Q2 Plans Chapter 16 Page 16 04...
Page 263: ......
Page 264: ...PAGE 16 5 Q2 Plans Chapter 16 Page 16 06...
Page 266: ......
Page 272: ......
Page 273: ...PAGE 17 2...
Page 276: ...END OF CHAPTER PAGE 17 3...
Page 279: ...END OF CHAPTER PAGE 18 1...
Page 284: ......
Page 286: ......
Page 288: ......
Page 295: ...Congratulations on completing your very own Q2 PAGE 20 4...
Page 296: ...Q2 Plans Chapter 20 Page 20 05...
Page 297: ......
Page 299: ......