The fuel tank must be trimmed to fit your fuselage. Refer back
to the chapter on Basic Fuselage Assembly for a sketch showing the
fuel tank positioning. The leading edge of the fuel tank is nominally
at FS36.1; the trailing edge should be at about F558.1 in order to
provide a nominal 6 inches of clearance between the fuel tank and the
Seatback Bulkhead. You will find that the sides of the fuel tank need
to be trimmed back to allow the fuel tank to sit down against the
fuselage bottom. Verify that the elevator control rod C513 does not
interfere with the top of the main fuel tank as it runs forward to
the elevator by skipping ahead in this chapter. If it does, you must
trim down the height of the main fuel tank to clear by a minimum of
3/8", or laminate a slot into the fuel tank for this CS13 clearance.
.....
Baffles are used to prevent excessive sloshing of the fuel
within the tank, as well as to increase the stiffness of the fuel
tank so that it may be stepped on during entry and exit from the
aircraft.
.....
Three baffles are used; one spanwise baffle about 18" wide, and
two longitudinal baffles that extend from the landing edge of the
fuel tank to within 4 inches of the trailing edge of the fuel tank.
The sketches illustrate positioning and size. Note that openings are
left regularly along the baffles to allow fuel to move back and forth
slowly. Particularly note the opening at the top which is part of the
venting system. Those openings should be about 2 inches in length and
about 1" in height, and need not be accurately shaped.
.....
The baffles are fitted using trial and error until they fit both
against the fuel tank and also against the fuselage bottom when the
tank is inserted into place. Each baffle should have 1 BID on each
side, and the 1/4" thick white foam is used for the core material.
Once each baffle is properly trimmed, it should be mounted
permanently to the fuel tank with micro and a BID tape on either side
with a minimum 1" lapping onto each surface. ,Upon installation of
the fuel tank permanently to the fuselage, these baffles will be
coated liberally with flox so that they bond to the fuselage bottom.
PAGE 14-3
CONTINUED ON NEXT PAGE
Q2 Plans - Chapter 14 - Page 14-04
Summary of Contents for Q2 Lite
Page 10: ...Q2 Plans Appendix Page v Q2 Plans Chapter 1 Page 1 1...
Page 17: ...Q2 Plans Chapter 1 Page 1 3...
Page 18: ......
Page 25: ...CONTINUED ON NEXT PAGE PAGE 3 1 Q2 Plans Chapter 3 Page 3 02...
Page 29: ...CONTINUED ON NEXT PAGE...
Page 70: ...CONTINUED ON NEXT PAGE PAGE 3 15 Q2 Plans Chapter 3 Page 3 16...
Page 71: ......
Page 72: ......
Page 74: ...CONTINUED ON NEXT PAGE PAGE 3 16 Q2 Plans Chapter 3 Page 3 17...
Page 115: ...Q2 Plans Chapter 6 Page 6 02...
Page 123: ...END OF CHAPTER PAGE 7 2 Q2 Plans Chapter 8 Page 8 01...
Page 127: ...CONTINUED ON NEXT PAGE PAGE 8 2 Q2 Plans Chapter 8 Page 8 03...
Page 134: ...END OF CHAPTER PAGE 8 5...
Page 136: ...NOTE See Bottom and Top Main Wing Lamination Drawing for exact sizing of sparcaps A thru M...
Page 137: ...CONTINUED ON NEXT PAGE PAGE 9 1 Q2 Plans Chapter 9 Page 9 02...
Page 138: ...CONTINUED ON NEXT PAGE PAGE 9 2 Q2 Plans Chapter 9 Page 9 03...
Page 154: ...CONTINUED ON NEXT PAGE PAGE 9 8 Q2 Plans Chapter 9 Page 9 09...
Page 155: ......
Page 161: ...PAGE 10 2 Q2 Plans Chapter 10 Page 10 03 PAGE 10 3...
Page 167: ...PAGE 10 5...
Page 174: ......
Page 176: ...CONTINUED ON NEXT PAGE PAGE 10 9 Q2 Plans Chapter 10 Page 10 10...
Page 185: ...PAGE 11 2...
Page 187: ...CONTINUED ON NEXT PAGE PAGE 11 3...
Page 192: ...CONTINUED ON NEXT PAGE PAGE 11 5...
Page 196: ...PAGE 12 1...
Page 198: ......
Page 199: ......
Page 200: ...PAGE 12 2...
Page 206: ...PAGE 13 1 Q2 Plans Chapter 13 Page 13 02...
Page 209: ...PAGE 13 2 Q2 Plans Chapter 13 Page 13 03...
Page 211: ......
Page 212: ......
Page 213: ...PAGE 13 3...
Page 216: ...END OF CHAPTER PAGE 13 4...
Page 221: ...PAGE 14 2 Q2 Plans Chapter 14 Page 14 03...
Page 225: ......
Page 227: ...CONTINUED ON NEXT PAGE PAGE 14 4 Q2 Plans Chapter 14 Page 14 05...
Page 230: ...CONTINUED ON NEXT PAGE PAGE 14 5 Q2 Plans Chapter 14 Page 14 06...
Page 237: ......
Page 238: ...CONTINUED ON NEXT PAGE PAGE 14 8...
Page 240: ...PAGE 14 9...
Page 242: ......
Page 243: ...PAGE 14 10...
Page 246: ...PAGE 15 1 Q2 Plans Chapter 15 Page 15 02...
Page 249: ...END OF CHAPTER PAGE 15 2 Q2 Plans Chapter 16 Page 16 01 ENGINE INSTALLATION...
Page 254: ...PAGE 16 2 Q2 Plans Chapter 16 Page 16 03...
Page 257: ......
Page 258: ...PAGE 16 3 Q2 Plans Chapter 16 Page 16 04...
Page 263: ......
Page 264: ...PAGE 16 5 Q2 Plans Chapter 16 Page 16 06...
Page 266: ......
Page 272: ......
Page 273: ...PAGE 17 2...
Page 276: ...END OF CHAPTER PAGE 17 3...
Page 279: ...END OF CHAPTER PAGE 18 1...
Page 284: ......
Page 286: ......
Page 288: ......
Page 295: ...Congratulations on completing your very own Q2 PAGE 20 4...
Page 296: ...Q2 Plans Chapter 20 Page 20 05...
Page 297: ......
Page 299: ......