wrinkles and kinks out. Don't get ahead of yourself on pouring
microfoam slurry on the foam; otherwise, by the time you are ready to
place the UNI over a particular area, you will have a messy, hard
lump of slurry. Work with one piece of cloth at a time, and with
small batches of slurry and epoxy. Also, unrolling the UNI cloth as
needed is advised to reduce the awkwardness of the large pieces.
Scrap UNI can be used to fill in any small spots not covered by the
large pieces of UNI.
.....
At the leading edge of the main wing cores, let the UNI cloth
hang vertically down. Trim to within 1" of the tangent point, just
like you did on the ailerons. At the trailing edge, allow the cloth
to drape around the corner and down to the bottom of the shear web so
that the UNI is at 45 degrees to-the T.E. on that face also. Trim the
main wing tip UNI to within t" of the main wing core. Inboard, along
the trim line, also allow the UNI to drape over the edge and down to
the bottom.
.....
No overlap is required on the UNI wing skin; just butt fit the
skins together.' You must, however, squeegee the cloth well to avoid
building up excess epoxy in the lamination.
.....
The second ply of UNI is also placed at 45 degrees to the T.E.
of the main wing cores but in the other direction from the first ply,
so that the two plies of UNI will have their major fiber orientations
at 90 degrees to each other. The second ply will be easier because it
is being layed up over glass and not the foam. Try to avoid having
the butt joints from the first ply of UNI coincide with the butt
joints from the second ply of UNI. The second ply of UNI is also
draped around the corner and down to the bottom of the shear web, so
that the shear web has two plies of UNI at 45 degrees to the T.E. and
at 90 degrees to each other. Trim all edges like you did on the first
ply.
.....
Spar Caps A thru F are laminated in that order, with the widest
cap going on first. To pick up a spar cap and place it on the main
wing, use three people. While one person holds each end of the spar
cap, the third removes any frazzles, being careful not to reduce the
width below what is called out for the particular spar cap. That
third person then stands at BL00 and positions the spar cap in the
proper location (centerline on BL00 and proper distance from the
leading edge of the main wing) while the other two individuals keep
the cloth off of the foam so that it won't stick. When the center
(third) person is ready, one of the individuals holding an end lays
it down spanwise on the main wing in the proper position (in relation
to the main wing L.E.) and removes any wrinkles and kinks. This can
be a slow process, so stay patient. The center individual makes sure
that the spar cap smoothly "turns the corner" at BL00.
.....
Squeegee each spar cap from BL00 outboard to keep the UNI fibers
straight. Work out any wrinkles or kinks by pulling carefully on the
fibers.
.....
The remaining spar caps are each put on in a similar fashion. We
know you are getting tired, but you must squeegee each cap well to
avoid building up considerable epoxy on the bottom plies. Use extra
epoxy very sparingly on the last spar cap.
.....
Locate the places where you bonded in the two SH1's (the 1" x 1"
mild steel plates) and laminate a pad of 20 plies of BID over each
one. The BID cloth should be about 2" x 2" dimensionally.
.....
Before quitting, peel ply all joints, and the first two inches
of the main wing L.E.. Also, knife trim the L.E. at the tangent
Summary of Contents for Q2 Lite
Page 10: ...Q2 Plans Appendix Page v Q2 Plans Chapter 1 Page 1 1...
Page 17: ...Q2 Plans Chapter 1 Page 1 3...
Page 18: ......
Page 25: ...CONTINUED ON NEXT PAGE PAGE 3 1 Q2 Plans Chapter 3 Page 3 02...
Page 29: ...CONTINUED ON NEXT PAGE...
Page 70: ...CONTINUED ON NEXT PAGE PAGE 3 15 Q2 Plans Chapter 3 Page 3 16...
Page 71: ......
Page 72: ......
Page 74: ...CONTINUED ON NEXT PAGE PAGE 3 16 Q2 Plans Chapter 3 Page 3 17...
Page 115: ...Q2 Plans Chapter 6 Page 6 02...
Page 123: ...END OF CHAPTER PAGE 7 2 Q2 Plans Chapter 8 Page 8 01...
Page 127: ...CONTINUED ON NEXT PAGE PAGE 8 2 Q2 Plans Chapter 8 Page 8 03...
Page 134: ...END OF CHAPTER PAGE 8 5...
Page 136: ...NOTE See Bottom and Top Main Wing Lamination Drawing for exact sizing of sparcaps A thru M...
Page 137: ...CONTINUED ON NEXT PAGE PAGE 9 1 Q2 Plans Chapter 9 Page 9 02...
Page 138: ...CONTINUED ON NEXT PAGE PAGE 9 2 Q2 Plans Chapter 9 Page 9 03...
Page 154: ...CONTINUED ON NEXT PAGE PAGE 9 8 Q2 Plans Chapter 9 Page 9 09...
Page 155: ......
Page 161: ...PAGE 10 2 Q2 Plans Chapter 10 Page 10 03 PAGE 10 3...
Page 167: ...PAGE 10 5...
Page 174: ......
Page 176: ...CONTINUED ON NEXT PAGE PAGE 10 9 Q2 Plans Chapter 10 Page 10 10...
Page 185: ...PAGE 11 2...
Page 187: ...CONTINUED ON NEXT PAGE PAGE 11 3...
Page 192: ...CONTINUED ON NEXT PAGE PAGE 11 5...
Page 196: ...PAGE 12 1...
Page 198: ......
Page 199: ......
Page 200: ...PAGE 12 2...
Page 206: ...PAGE 13 1 Q2 Plans Chapter 13 Page 13 02...
Page 209: ...PAGE 13 2 Q2 Plans Chapter 13 Page 13 03...
Page 211: ......
Page 212: ......
Page 213: ...PAGE 13 3...
Page 216: ...END OF CHAPTER PAGE 13 4...
Page 221: ...PAGE 14 2 Q2 Plans Chapter 14 Page 14 03...
Page 225: ......
Page 227: ...CONTINUED ON NEXT PAGE PAGE 14 4 Q2 Plans Chapter 14 Page 14 05...
Page 230: ...CONTINUED ON NEXT PAGE PAGE 14 5 Q2 Plans Chapter 14 Page 14 06...
Page 237: ......
Page 238: ...CONTINUED ON NEXT PAGE PAGE 14 8...
Page 240: ...PAGE 14 9...
Page 242: ......
Page 243: ...PAGE 14 10...
Page 246: ...PAGE 15 1 Q2 Plans Chapter 15 Page 15 02...
Page 249: ...END OF CHAPTER PAGE 15 2 Q2 Plans Chapter 16 Page 16 01 ENGINE INSTALLATION...
Page 254: ...PAGE 16 2 Q2 Plans Chapter 16 Page 16 03...
Page 257: ......
Page 258: ...PAGE 16 3 Q2 Plans Chapter 16 Page 16 04...
Page 263: ......
Page 264: ...PAGE 16 5 Q2 Plans Chapter 16 Page 16 06...
Page 266: ......
Page 272: ......
Page 273: ...PAGE 17 2...
Page 276: ...END OF CHAPTER PAGE 17 3...
Page 279: ...END OF CHAPTER PAGE 18 1...
Page 284: ......
Page 286: ......
Page 288: ......
Page 295: ...Congratulations on completing your very own Q2 PAGE 20 4...
Page 296: ...Q2 Plans Chapter 20 Page 20 05...
Page 297: ......
Page 299: ......