CANOPY ASSEMBLY AND MOUNTING
INTRODUCTION
.....
In this chapter, you will install the canopy that you
previously mounted and cut out in Chapter 8. It is important to the
passengers' safety to have a canopy that is strong, rigid, and
securely fastened while in flight. Therefore, do not rush this
section.
FORWARD EDGE LAMINATION
.....
Laminate 3 UNI across the front edge of the canopy, with the
orientation across the front of the canopy. This lamination of 3 inch
wide tapes will increase the stiffness and strength of the canopy at
the forward edge.
PROTECTING THE CANOPY PLEXIGLASS
.....
The canopy was shipped to you with a protected coating applied
on either side. You should be careful during construction that you do
not remove this coating, exposing the canopy to scratches and
abrasion. Once the aircraft is completely finished and painted, the
coating may be peeled away in strips, exposing the canopy Plexiglas
itself. Whenever, you laminate onto the canopy surface, you will,
however, need to remove the coating where the bond will take place.
Protect the edge of canopy/lamination junction with grey tape. This
will assist in providing a trim mask for knife trimming.
CANOPY FRAME STIFFENERS
.....
Three stiffeners will be fabricated. One each will be installed
on each side of the canopy frame longitudinally, and the third will
be installed transversely across the bottom of the aft canopy
bulkhead. At the lower aft left and right points of the canopy frame,
these three stiffeners join together.
.....
It is recommended that the core materials for these stiffeners
be 1/4" thick plywood. An alternative is to use 1/4" thick white
foam, but this alternative would require several plywood inserts for
local beefup where bolts are inserted.
.....
As installed, each stiffener should be approximately 1.3" wide.
Because the canopy frame sides are curved as they travel forward,
those two stiffeners should be made about 1.8" wide to allow for
fitting. The third stiffener, the one fitted to the aft canopy
bulkhead, can be made 1.3" wide.
.....
To construct the stiffeners, cut three pieces of 1/4" plywood
with the following sizes: 1.8" x 30", 1.8" X 30", and 1.3" x 44". Set
them vertically on the jig table and hold them in place with a dab of
5-MIN on either end of each one. Round the top corners of the plywood
so that the glass cloth will flow smoothly around the corners.
Laminate 3 UNI with the orientation running lengthwise along the long
dimension. The excess cloth that overlaps onto the table can be
trimmed later.
Summary of Contents for Q2 Lite
Page 10: ...Q2 Plans Appendix Page v Q2 Plans Chapter 1 Page 1 1...
Page 17: ...Q2 Plans Chapter 1 Page 1 3...
Page 18: ......
Page 25: ...CONTINUED ON NEXT PAGE PAGE 3 1 Q2 Plans Chapter 3 Page 3 02...
Page 29: ...CONTINUED ON NEXT PAGE...
Page 70: ...CONTINUED ON NEXT PAGE PAGE 3 15 Q2 Plans Chapter 3 Page 3 16...
Page 71: ......
Page 72: ......
Page 74: ...CONTINUED ON NEXT PAGE PAGE 3 16 Q2 Plans Chapter 3 Page 3 17...
Page 115: ...Q2 Plans Chapter 6 Page 6 02...
Page 123: ...END OF CHAPTER PAGE 7 2 Q2 Plans Chapter 8 Page 8 01...
Page 127: ...CONTINUED ON NEXT PAGE PAGE 8 2 Q2 Plans Chapter 8 Page 8 03...
Page 134: ...END OF CHAPTER PAGE 8 5...
Page 136: ...NOTE See Bottom and Top Main Wing Lamination Drawing for exact sizing of sparcaps A thru M...
Page 137: ...CONTINUED ON NEXT PAGE PAGE 9 1 Q2 Plans Chapter 9 Page 9 02...
Page 138: ...CONTINUED ON NEXT PAGE PAGE 9 2 Q2 Plans Chapter 9 Page 9 03...
Page 154: ...CONTINUED ON NEXT PAGE PAGE 9 8 Q2 Plans Chapter 9 Page 9 09...
Page 155: ......
Page 161: ...PAGE 10 2 Q2 Plans Chapter 10 Page 10 03 PAGE 10 3...
Page 167: ...PAGE 10 5...
Page 174: ......
Page 176: ...CONTINUED ON NEXT PAGE PAGE 10 9 Q2 Plans Chapter 10 Page 10 10...
Page 185: ...PAGE 11 2...
Page 187: ...CONTINUED ON NEXT PAGE PAGE 11 3...
Page 192: ...CONTINUED ON NEXT PAGE PAGE 11 5...
Page 196: ...PAGE 12 1...
Page 198: ......
Page 199: ......
Page 200: ...PAGE 12 2...
Page 206: ...PAGE 13 1 Q2 Plans Chapter 13 Page 13 02...
Page 209: ...PAGE 13 2 Q2 Plans Chapter 13 Page 13 03...
Page 211: ......
Page 212: ......
Page 213: ...PAGE 13 3...
Page 216: ...END OF CHAPTER PAGE 13 4...
Page 221: ...PAGE 14 2 Q2 Plans Chapter 14 Page 14 03...
Page 225: ......
Page 227: ...CONTINUED ON NEXT PAGE PAGE 14 4 Q2 Plans Chapter 14 Page 14 05...
Page 230: ...CONTINUED ON NEXT PAGE PAGE 14 5 Q2 Plans Chapter 14 Page 14 06...
Page 237: ......
Page 238: ...CONTINUED ON NEXT PAGE PAGE 14 8...
Page 240: ...PAGE 14 9...
Page 242: ......
Page 243: ...PAGE 14 10...
Page 246: ...PAGE 15 1 Q2 Plans Chapter 15 Page 15 02...
Page 249: ...END OF CHAPTER PAGE 15 2 Q2 Plans Chapter 16 Page 16 01 ENGINE INSTALLATION...
Page 254: ...PAGE 16 2 Q2 Plans Chapter 16 Page 16 03...
Page 257: ......
Page 258: ...PAGE 16 3 Q2 Plans Chapter 16 Page 16 04...
Page 263: ......
Page 264: ...PAGE 16 5 Q2 Plans Chapter 16 Page 16 06...
Page 266: ......
Page 272: ......
Page 273: ...PAGE 17 2...
Page 276: ...END OF CHAPTER PAGE 17 3...
Page 279: ...END OF CHAPTER PAGE 18 1...
Page 284: ......
Page 286: ......
Page 288: ......
Page 295: ...Congratulations on completing your very own Q2 PAGE 20 4...
Page 296: ...Q2 Plans Chapter 20 Page 20 05...
Page 297: ......
Page 299: ......