60
QXS G2 Hardware Installation and Maintenance Guide
1
Examine the packaging for crushes, cuts, water damage, or any other evidence of mishandling
during transit.
• If you suspect that damage has happened, photograph the package before opening, for
possible future reference.
• Retain original packaging materials for use with returns.
2
The unpacking sequence pertaining to 2U chassis is shown in
.
Figure 58
Unpack 2U Chassis (2U24 Chassis Shown)
The 2U chassis are supplied with the midplane PCB, PSUs, drives, and RAID controllers and/or
expansion IOMs installed. For information about plug-in module replacement, see “Module removal
and replacement”. Drive blanks must be installed in unused drive slots.
3
The unpacking procedure pertaining to the 5U84 is shown in
CAUTION:
The chassis does not include DDICs, but all rear panel modules are installed.
•
This partially-populated chassis is quite heavy: 64 kg (142 lb).
•
Verify that each strap is securely wrapped and buckled.
•
Four people are required to lift the 5U84 from the box.
Summary of Contents for QXS G2 Series
Page 1: ...QXS G2 Hardware Installation and Maintenance Guide 12 24 and 84 Drive Systems 6 68649 01 Rev A...
Page 126: ...114 QXS G2 Hardware Installation and Maintenance Guide...
Page 176: ...164 QXS G2 Hardware Installation and Maintenance Guide...
Page 232: ...220 QXS G2 Hardware Installation and Maintenance Guide...
Page 236: ...224 QXS G2 Hardware Installation and Maintenance Guide...
Page 246: ...234 QXS G2 Hardware Installation and Maintenance Guide...