110 QXS G2 Hardware Installation and Maintenance Guide
2
Plug the power cords into the power cord receptacles on the rear of the expansion chassis.
3
Plug the other end of the power cords into the rack power source.
NOTE:
Each expansion chassis takes approximately 3 minutes to power on (drives to spin up and/or
come online).
4
Turn on (1) the PSU0 power switch and then turn on the PSU1 power switch.
• Expansion chassis powers on within 3 minutes.
• While the expansion chassis power up, their LEDs blink. After the LEDs stop blinking—if no
LEDs on the front and back of the chassis are amber—the power-on sequence is complete, and
no faults have been detected.
• The Power on/Standby LED on the 5U Ops panel should be lit green when the chassis power is
activated.
• See
on page 128 for details pertaining to 5U84 Ops panel LEDs and
related fault conditions.
NOTE:
Repeat these steps for any other expansion chassis within this configuration.
Powering On the 5U84 RAID Chassis
To power on the RAID chassis:
1
Locate the power supply units (PSU0 and PSU1) on the rear of the 5U84 RAID chassis.
Representative system shown in
Figure 97
5U84 Representative RAID Chassis (Rear View)
1
3
2
4
6
5
1
PSU0
2
PSU0 Power Receptacle
Summary of Contents for QXS G2 Series
Page 1: ...QXS G2 Hardware Installation and Maintenance Guide 12 24 and 84 Drive Systems 6 68649 01 Rev A...
Page 126: ...114 QXS G2 Hardware Installation and Maintenance Guide...
Page 176: ...164 QXS G2 Hardware Installation and Maintenance Guide...
Page 232: ...220 QXS G2 Hardware Installation and Maintenance Guide...
Page 236: ...224 QXS G2 Hardware Installation and Maintenance Guide...
Page 246: ...234 QXS G2 Hardware Installation and Maintenance Guide...