214 QXS G2 Hardware Installation and Maintenance Guide
5
Place the chassis on a static-protected work surface near the replacement chassis, with the
removed DDICs and rackmount screws.
Installing a Replacement 5U84 Chassis into the Rack
CAUTION:
If any licenses other an Q-Tier (virtualization) were installed on the system, after chassis
swap, customer must obtain a new license set tied to the new OEM serial number. Refer to the QXS
G2 Licensing Guide to obtain the license set. Also, differentiate the TLA serial number from the OEM
serial number.
This section provides a procedure for installing the replacement chassis in its rack location.
IMPORTANT:
, page 64 when installing the chassis into the rack.
IMPORTANT:
Install the chassis into the rack before re-inserting the DDICs. A suitable mechanical lift
is required to move the chassis.
1
Support the bottom of the chassis. Carefully lift/align the chassis and while maintaining a level
position for the chassis, slide it into the rack.
2
Using the appropriate mounting hardware, secure the chassis to the rack.
3
Using the applicable retaining screws, secure the front and rear of the chassis to the rack and rails.
Summary of Contents for QXS G2 Series
Page 1: ...QXS G2 Hardware Installation and Maintenance Guide 12 24 and 84 Drive Systems 6 68649 01 Rev A...
Page 126: ...114 QXS G2 Hardware Installation and Maintenance Guide...
Page 176: ...164 QXS G2 Hardware Installation and Maintenance Guide...
Page 232: ...220 QXS G2 Hardware Installation and Maintenance Guide...
Page 236: ...224 QXS G2 Hardware Installation and Maintenance Guide...
Page 246: ...234 QXS G2 Hardware Installation and Maintenance Guide...