Operation 109
b
Disconnect the power cord’s male plug from the power source.
c
Disconnect the power cord’s female plug from the power cord receptacles on PSU0 and PSU1.
4
On the expansion chassis (all attached in this configuration) complete the following:
a
Turn off (0) the PSU0 power switch and then turn off the PSU1 power switch.
b
Disconnect the power cord’s male plug from the power source.
c
Disconnect the power cord’s female plug from the power cord receptacles on PSU0 and PSU1.
Powering On the 5U84 System
This section provides the following information:
•
Powering On the 5U84 Expansion Chassis
•
Powering On the 5U84 RAID Chassis
Powering On the 5U84 Expansion Chassis
To power on the expansion chassis:
CAUTION:
and
and verify that all expansion chassis and RAID chassis
power switches are in the off position (0) to ensure none of the chassis power on before needed.
1
Locate the power supply units (PSU0 and PSU1) on the rear of the 5U84 expansion chassis in
.
Figure 96
5U84 Expansion Chassis (Rear View)
1
2
1
3
2
4
6
5
1
PSU0
2
PSU0 Power Receptacle
3
PSU0 Power Switch
4
PSU1
5
PSU1 Power Receptacle
6
PSU1 Power Switch
Summary of Contents for QXS G2 Series
Page 1: ...QXS G2 Hardware Installation and Maintenance Guide 12 24 and 84 Drive Systems 6 68649 01 Rev A...
Page 126: ...114 QXS G2 Hardware Installation and Maintenance Guide...
Page 176: ...164 QXS G2 Hardware Installation and Maintenance Guide...
Page 232: ...220 QXS G2 Hardware Installation and Maintenance Guide...
Page 236: ...224 QXS G2 Hardware Installation and Maintenance Guide...
Page 246: ...234 QXS G2 Hardware Installation and Maintenance Guide...