After power is applied to the library, you need to do the following:
•
Set the library SCSI address
•
Set tape drive SCSI addresses
•
Run a library self-test
Refer to the Quantum|ATL 7100 Series Tape Library Operator’s Guide
for a description of how to set SCSI addresses and run a library
self-test.
Connecting the Library to the Host Controller
3
This section explains how to connect the host cables to the library.
The library is shipped with the internal cabling configured for four
separate host SCSI connections (four-wire) with all busses
terminating externally. Alternate host connection configurations
are discussed in
Appendix A, “SCSI Cabling Options,”
of this
guide.
Note:
Internal SCSI cabling changes are required to configure
the library for a configuration different than the default.
Any additional cables required for internal cabling
changes are provided in the library accessories kit. The
accessories kit does NOT include any additional cabling
or terminators for connection to the host computer.
Summary of Contents for ATL 7100
Page 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Page 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...