Chapter 3 Installing the Library
Leveling the Library
24
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
•
Digital voltmeter (DVM)
•
ESD protection kit
Leveling the Library
3
To level the library:
1
Move the library onto its designated footprint in the final
installation area.
2
Lower each foot of the library until it makes contact with the
floor.
3
Moving in a clockwise direction from the library front, rotate
each foot clockwise so that each caster is raised approximately
1/4” off of the floor.
4
Center a carpenter’s level on the top front edge of the library.
5
Check the gauge on the level. If the front of the library is level,
proceed to step 6. If it is not level:
a
Determine the tilt of the library and adjust the appropriate
front foot with the wrench, checking the gauge each time
that a foot is rotated ¼ turn.
b
Repeat step 5 until the front is level, then continue to the
next step.
6
Center the carpenter’s level on the top left edge of the library.
Note:
Completing this task involves leveling one side of the
library at a time, moving in a clockwise direction starting
at the front and ending with the right-side of the library.
Caution:
When adjusting the feet for leveling purposes,
DO NOT raise any foot so high that excess weight
is transferred to any single caster.
Summary of Contents for ATL 7100
Page 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Page 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...