
Chapter 3 Installing the Library
Preparing the Library for Operation
32
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
Preparing the Library for Operation
3
After the library is installed and connected to the host, you can
perform the procedures listed below as needed to prepare the
library for operation.
For a description of how to perform these procedures, refer to the
Quantum|ATL 7100 Series Tape Library Operator’s Guide.
•
Defining the library power-up state
•
Enabling/disabling the auto clean option
•
Enabling/disabling the auto load option
•
Setting the language used for the status display area
•
Enabling/disabling 4/52 identity mode
•
Loading the library with cartridges (either through the load
port or by bulk loading of cartridges through the storage array
door)
•
Performing an inventory
•
Turning the interior light on or off
Summary of Contents for ATL 7100
Page 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Page 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...