Unpacking and Moving the
Library
This chapter describes how to unpack and move the library to the
final installation area.
Receiving the Library
2
When you receive the crated library, unload it as close to the final
installation area as possible and allow approximately ten feet in
front of the off-load side of the pallet. This ensures that there is
enough space to lower the ramp before removing the library from
the pallet.
Also make sure that the room has a minimum ceiling height of
eight feet to provide clearance for removal of the box from the
pallet.
Caution:
The procedures in this chapter must be performed in
the order in which they appear in this chapter.
Summary of Contents for ATL 7100
Page 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Page 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...