Chapter 2 Unpacking and Moving the Library
Moving the Library to the Final Installation Area
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
17
Moving the Library to the Final Installation Area
2
To move the library to the final installation area:
1
Based on the information above, prepare the path to the final
installation area.
2
Verify that all leveling feet are fully retracted. If the feet are not
fully retracted, rotate each of the four feet counterclockwise
until they are fully retracted.
3
Roll the library to the final installation area.
Warning:
The library weighs approximately 500 lb. Use two
people to move the library.
Note:
When moving the cabinet, one person should guide the
library from the rear while the other person pushes from
the front. Do not push the library up or down a ramp
with an incline greater than 10
°
.
Caution:
The library has a nominal floor clearance of 0.75"
(1.9cm). Place stiff plastic or rubber mats on top of
carpeting that depresses more than the nominal
clearance and over floor cracks and door jambs prior
to rolling the library over them.
Caution:
Any side of the library can be used to push the library
to the final installation area. However, it is preferred
to push from the front of the library. When pushing
from the front, DO NOT push on the following non-
structural portions:
• Load port door
• Control panel
• Front door
• Front door handle
Summary of Contents for ATL 7100
Page 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Page 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...