Chapter 3 Installing the Library
Operational Setup and Checkout
26
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
Operational Setup and Checkout
3
The purpose of the following procedures is to verify the proper
operation of the library before placing the library on-line.
Applying Power to
the Library
3
To apply power to the library:
1
Verify the following:
•
Actuators move freely in the horizontal and vertical
directions
•
All doors are closed
•
All cosmetic panels are attached
•
Power switch in the
O
(off) position
2
Connect the AC power cord to the rear panel and facility
power (see
3
On the rear panel, set the
POWER
switch to the “|” (on)
position (see
).
4
After several seconds, verify that the Status Display Area
(SDA) shows
System On-line
.
Caution:
Using a digital voltmeter (DVM), verify that the
facility power is 90-132VAC or 180-264 VAC @
47-63Hz before connecting the AC power cord.
Note:
On-line
is only displayed if the library power-up
state is configured for
On-Line
.
Otherwise,
S
ystem
Off-line
is displayed in the SDA. See the Operator’s
Guide for more information.
Summary of Contents for ATL 7100
Page 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Page 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...