Chapter 1 Library Specifications and Site Requirements
Site Requirements
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
9
The power inlet connector is a IEC-320 connector. For international
applications you must replace the power cord set with a
harmonized 3x2.0mm
2
power cord set that is approved by the
country where used.
Figure 4 Library AC
Power Receptacle
Grounding
1
The installation site must provide an earth ground cable for the
library.
Ground
Line
Neutral
~100-120V / ~200 - 240V
3.5A / 7A
50/60 Hz
IEC-320 Type
Summary of Contents for ATL 7100
Page 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Page 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Page 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...