background image

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G10+ / HL

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G10+ / HL

2

3

Table of contents

1 Introduction

With solar modules from Hanwha Q CELLS America Inc. 

(hereafter referred to as "Q CELLS") you can directly 

transform the sun’s limitless energy into environmentally-

friendly solar electricity. In order to ensure the maximum 

performance of your Q CELLS solar modules, please read the 

following instructions completely and carefully and observe 

all guidelines. Non-compliance may result in damage and / or 

physical injury.

This installation and operation manual (hereafter also referred to 

as the “Manual”) provides instructions for the safe installation and 

operation of crystalline solar modules.

  Please read these instructions carefully before proceeding with 

your installation.

  Please retain these instructions for the life of the solar modules.

  Please ensure that this Manual is available to the operator at all 

times.

  This Manual should be given to all subsequent owners or users 

of the solar modules.

  All supplements received from the manufacturer should be 

included.

  Please observe all other applicable documents.

  If your questions are not satisfactorily answered in the manual, 

please contact your system supplier.

Additional information can be found on our website at 

www.qcells.com.

Intended use

This manual is valid in North America for Q CELLS solar 

modules. These instructions contain information regarding the 

safe handling and use of quality crystalline solar modules from 

Q CELLS and their installation, mounting, wiring, maintenance.

Symbols and Labels

The following symbols and labels are used throughout the 

installation manualfor ease of use.

SYMBOL

DESCRIPTION

Procedure with one or more steps.
Lists of items.
Ensure that when carrying out a procedure, you 

check the results of said procedure.
Prohibited.

Beware of possible danger or damage. 

Categories:

 

Danger: Risk of fatal injury

 

Attention: Risk of serious injury or damage to 
property

 

Note: Risk of damage to product

Units

Where both Imperial and U.S. units (for example inches) 
are shown, metric units are definitive. References to “Data 
Sheet” or “Module Data Sheet” refer to the Module Data 
Sheet applicable to the module being used.

Safety Regulations

The installer and solar module operator are responsible for 

compliance with all applicable statutory requirements and 

regulations.

  The following regulations and standards must be upheld at all 

times during the installation, operation, and maintenance of the 

solar modules:

 

Installation and Operation Manual.

 

Other applicable documents (such as country-specific 

regulations for pressure equipment, operational safety, 

hazardous goods, and environmental protection).

 

Regulations and requirements specific to the system.

 

Applicable country-specific laws, regulations, and provisions 

governing the planning, installation, and operation of solar 

power systems and work on roofs.

 

Any valid international, national and regional regulations 

governing work with direct current, especially those 

applicable to the installation of electrical devices and 

systems, and regulations issued by the respective energy 

provider governing the parallel operation of solar power 

systems.

 

Accident-prevention regulations.

Certified Personnel

Both, the operator and installer are responsible for ensuring 

that the installation, maintenance, connection to the grid, and 

dismantling are carried out by trained and qualified electricians 

and engineers with approved training certificates (issued by a 

state or federal organization) for the respective specialist trade. 

Electrical work may only be performed by an officially certified 

tradesperson in accordance with the applicable safety standards, 

accident prevention regulations, and the regulations of the local 

energy provider. 

DOCUMENT REVISION 01

This Manual is valid for Africa, Asia, Europe, Latin America and South America as of April 1st 2022 for Q.PEAK DUO ML-G11.X solar modules, and replaces all earlier versions.

DISCLAIMER

This manual is subject to change. The data sheets and customer information valid at the point in time when the relevant module was manufactured apply to the installation, mounting,

and maintenance procedures for the respective solar modules, as far as no updated document is provided.

1 Introduction 3

2 Planning 5

2.1 Technical specifications 

5

2.2 Requirements 6
2.3 Mounting options 

7

2.4 Electrical  layout 10

3 Installation 11

3.1 Safety and transport 

11

3.2 Preparation of installation 

13

3.3 Module installation 

14

4 Electrical Connection 

15

4.1 Safety 15
4.2 Electrical installation safety 

16

4.3 Connection of modules 

17

4.4 After  installation 18

5 Grounding 19

6 Faults and defects 

20

7 Disposal 20

8  Maintenance and Cleaning 

20

Summary of Contents for Q.PEAK DUO BLK-G10+ / HL Series

Page 1: ...Installation and operation manual Q PEAK DUO BLK G10 HL solar module series...

Page 2: ...The installer and solar module operator are responsible for compliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times d...

Page 3: ...ystem Your financial success depends on the fulfillment of these requirements Other applicable documents This installation manual is only valid in combination with the following technical information...

Page 4: ...tact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ensure that no additional forces are applied through the mounting system into the module except for the...

Page 5: ...ounting rails If connection cable runs between laminate and mounting it should be running at mounting rails position close to frame parts Modules bend under load Therefore sharp objects e g screws bal...

Page 6: ...ter into account when determining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or...

Page 7: ...nection cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objec...

Page 8: ...electric arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that...

Page 9: ...y only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type a...

Page 10: ...n to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded with the racking system using UL1703 o...

Page 11: ...t taking adequate security precautions Please commission a trade specialist NOTE Module surface damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch o...

Page 12: ...Installation manual solar modules Q PEAK DUO BLK G10 _HL_modules_series_2022 05_Rev01_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL inquiry us q...

Reviews: