INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G10+ / HL

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G10+ / HL

6

7

2 Planning

2.2 Requirements

Installation Site

Please note the following guidelines that apply to the installation 

site:

 

Solar modules are not explosion-proof and are not suitable for 

use in explosive environments.

  Do not operate solar modules near highly flammable gas and 

vapors (e.g. gas tanks, gas stations).

  Do not install modules in enclosed space.

  Do not install modules in locations where they may be 

submerged in water (e.g. floodplains).

  Do not use modules as a substitute for the normal roofing (e.g. 

modules are not watertight).

  Do not install modules in close proximity to air conditioning 

systems.

  Do not install modules above 13,120 ft (4,000 m) altitude above 

sea level.

  Contact with saline water (e.g. spray water from the sea) and 

salt aggregation on the modules must be avoided.

  Do not bring any chemical substance (e.g. oil, solvent etc.) into 

contact with any part of the panel. Only substances, which 

are released by Q CELLS, are allowed to be used during 

installation, operation and maintenance.

  Any installation of modules on surfaces of water is prohibited. 

This includes installations on floating as well as pile-based 

platforms. Q CELLS may extend the coverage of its warranty 

to such installations, based on a case by case assessment of 

the system design and location. A prior written consent by the 

warrantor is required in any case.

Prevention of Shadowing Effects

Optimal solar irradiation leads to maximum energy output:

  For this reason, install the modules so that they face the sun.

  Avoid shadowing (due to objects such as buildings, chimneys 

or trees).

  Avoid partial shading (for example through overhead lines, dirt, 

snow).

Limitations

The solar modules are designed for the following applications:

 

Operating temperatures from –40 °F to +185 °F.

 

Pull loads and push loads according to chapter 2.3 (‘Test 

Load’ in accordance with IEC 61215 and ‘Design Load ×1.5’ in 

accordance with UL 61730).

 

Installation using a mounting structure for solar modules.

Mounting Structure Requirements

Requirements for the mounting structure:

 

Conform to the necessary structural requirements.

 

Compliant with local snow and wind loads.

 

Properly fastened to the ground, the roof, or the façade.

 

Forces acting on the module are relayed to the mounting 

substructure.

 

Ensures sufficient rear ventilation of the module.

 

Avoid the usage of different metals to prevent contact 

corrosion.

 

Allows for stress-free expansion and contraction due to 

temperature fluctuations.

  Ensure that no additional forces are applied through the 

mounting system into the module except for the wind and snow 

loads. Additional forces and moments of torque at the mounting 

positions caused by torsions, displacements or vibrations in the 

mounting system are not allowed.

  Ensure that the clamps and the mounting frame are compatible.

Clamp System Recommendations

Use customary clamps that satisfy the following requirements:

 

Clamp width: ≥ 1.5 in (38 mm).

 

Clamp height compliant with a 1.57 in (40 mm) frame height.

 

Clamp depth: 0.28-0.47 in (7-12 mm). (applicable for all CL 

clamping mounting options at section "2.3 Mounting options")

 

Clamps are not in contact with the front glass.

 

Clamps do not deform the frame.

 

Clamps that satisfy the structural requirements based on the 

conditions of the installation site according to the applicable 

regulations and technical standards.

 

Long-term stable clamps that securely affix the module to the 

mounting frame.

Module Orientation Requirements

 

Vertical or horizontal installation is permitted.

  Ensure that rain and melting snow can run off freely. No water 

accumulation.

  Ensure that the drainage holes in the frame are not covered. 

No sealing.

75°

  Maintain the permissible angle of inclination.

 

Minimum angle of inclination: 3°

 

Inclination angles above 75° may be limited by 
local regulations

  Standing water on the modules glass needs to be 

avoided.

2 Planning

2.3 Mounting options

Fig. 2:

  Installation options for crystalline Q CELLS modules. All dimensions are given in inch (mm in brackets). Also observe the 

maximum test loads and clamping range as specified on the following page. 

The illustrated installation options apply for both horizontal and vertical module orientation.

Module

Clamp

Subconstruction

Mounting profile

TYPE OF

INSTALLATION

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM

Installation 

with clamps

0.79 - 25.6

(20 - 650)

North 

America

11.8 - 19.7

(300 - 500)

CL1a

CL1b

0.59 - 8.27

(15 - 210)

 

0.79 - 25.6

(20 - 650)

North 

America

11.8 - 19.7

(300 - 500)

CL1a

CL1b

0.59 - 8.27

(15 - 210)

CL2a

0.79 - 3.94

(20 - 100)

CL2b

0.79 - 7.87

(20 - 200)

      

CL2a

0.79 - 11.8

(20 - 300)

CL2b

0.79 - 11.8

(20 - 300)

xxx

(xxxx)

NA

xxx

(xxx)

CL6b

22.0 - 45.7

(560 - 1160)

0.79 - 15.7

(20 - 400)

CL6a

 

NA

CL6c

0.79 - 15.7

(20 - 400)

CL6d

0.79 - 9.8

(20 - 250)

22.0 - 45.7

(560 - 1160)

22.0 - 45.7

(560 - 1160)

 

NA

CL6c

0.79 - 15.7

(20 - 400)

CL6d

0.79 - 9.8

(20 - 250)

22.0 - 45.7

(560 - 1160)

22.0 - 45.7

(560 - 1160)

 

CL3

CL4

0 - 11.8

(0 - 300)

9.45 - 13.8

(240 - 350)

7.87 - 13.8

(200 - 350)

North 
America

CL3

CL4

0 - 11.8

(0 - 300)

HYBRID 

CLAMPING

11.8 - 17.7

(300 - 450)

NA

0.79 - 3.94 

(20 - 100)

CL5

Installation 

on mounting 

points

4 x mounting 

slots

NA

14.5

(368.5)

FB1

NA

4 × mounting 

slots

14.5

(368.5)

FB2

Summary of Contents for Q.PEAK DUO BLK-G10+ / HL Series

Page 1: ...Installation and operation manual Q PEAK DUO BLK G10 HL solar module series...

Page 2: ...The installer and solar module operator are responsible for compliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times d...

Page 3: ...ystem Your financial success depends on the fulfillment of these requirements Other applicable documents This installation manual is only valid in combination with the following technical information...

Page 4: ...tact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ensure that no additional forces are applied through the mounting system into the module except for the...

Page 5: ...ounting rails If connection cable runs between laminate and mounting it should be running at mounting rails position close to frame parts Modules bend under load Therefore sharp objects e g screws bal...

Page 6: ...ter into account when determining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or...

Page 7: ...nection cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objec...

Page 8: ...electric arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that...

Page 9: ...y only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type a...

Page 10: ...n to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded with the racking system using UL1703 o...

Page 11: ...t taking adequate security precautions Please commission a trade specialist NOTE Module surface damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch o...

Page 12: ...Installation manual solar modules Q PEAK DUO BLK G10 _HL_modules_series_2022 05_Rev01_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL inquiry us q...

Reviews: