INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G10+ / HL

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G10+ / HL

16

17

4 Electrical Connection

4.2 Electrical installation safety

4 Electrical Connection

4.3 Connection of modules

Danger! Risk of fatal injury due to electric shock!

  Be sure to maintain the time intervals as specified by 

the inverter manufacturer between switching off the 

inverter and beginning any further work.

Danger! Risk of fatal injury due to electric shock!

  Never plug or unplug the cable when under load. 

Modules must not carry any current.

1. Switch off the inverter.

OFF

EN

2. Switch off the DC circuit breaker.
3.  Measure shutdown in DC String. 

(no DC current flow).

4.  Disconnect plugs by the use of appropriate 

and qualified tools of the manufacturer.

5.  When connecting the modules proceed in reverse 

order.

Danger! Risk of fatal injury due to electric shock!

  Electrical work may only be performed by qualified 

and skilled personnel (see page 3).

  Ensure correct polarity.

  Use solar cables for the connection at the junction 

box outlet.

  Only interconnect connectors of the same type and 

manufacturer.

  Use minimum 4 mm2 copper wires insulated for a 

minimum of 90 °C for field connections.

Note! Module damage may occur!

  Ensure that the cabling is not under mechanical stress 

(Comply with bending radius of ≥ 60 mm).

  Ensure that the cables do not run between module 

and mounting rail or structure (danger of pinch).

  Do not connect modules with different orientations or 

angles of inclination in the same string.

  Ensure for a tight connection between the plugs. 

Plugs click together audibly.

EN

click

Danger! Risk of fatal injury due to electric shock!

  Ensure that all electrical components are in a proper, 

dry, and safe condition.

  To avoid complex cabling arrangements, it is often 

advantageous to rotate some modules 180°.

  Module orientation can clearly be identified from the 

front side by the serial number and barcode labelled 

behind the module glass on the side with negative 

connection cable.

EN

Inverter

180°

180°

SOLAR

Summary of Contents for Q.PEAK DUO BLK-G10+ / HL Series

Page 1: ...Installation and operation manual Q PEAK DUO BLK G10 HL solar module series...

Page 2: ...The installer and solar module operator are responsible for compliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times d...

Page 3: ...ystem Your financial success depends on the fulfillment of these requirements Other applicable documents This installation manual is only valid in combination with the following technical information...

Page 4: ...tact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ensure that no additional forces are applied through the mounting system into the module except for the...

Page 5: ...ounting rails If connection cable runs between laminate and mounting it should be running at mounting rails position close to frame parts Modules bend under load Therefore sharp objects e g screws bal...

Page 6: ...ter into account when determining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or...

Page 7: ...nection cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objec...

Page 8: ...electric arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that...

Page 9: ...y only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type a...

Page 10: ...n to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded with the racking system using UL1703 o...

Page 11: ...t taking adequate security precautions Please commission a trade specialist NOTE Module surface damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch o...

Page 12: ...Installation manual solar modules Q PEAK DUO BLK G10 _HL_modules_series_2022 05_Rev01_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL inquiry us q...

Reviews: