INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G10+ / HL

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G10+ / HL

14

15

3 Installation

3.3 Module installation

Option 1:

  Fasten the module with 4 clamps in the specified 

clamping range, see Fig. 2, p. 7.

  Tighten clamps according to manufacturer’s 

instructions.

  Maintain an interval of at least 10 mm between two 

modules along the short side and 5 mm along the 

long side.

10 mm

5 mm

EU

Note! Module damage may occur!

  Do not subject modules to mechanical tension. Max. 

torsion 10 mm/m.

Option 2:

  Install the module at the 4 mounting points,  

see Fig. 2, p. 7.

  Tighten screws according to manufacturer’s 

instructions.

Option 3:

  Install the module using mounting profiles,  

see Fig. 2, p. 7.

4 Electrical Connection

4.1 Safety

Danger! 
Risk of fatal injury due to electric shock!

When disconnecting an electric circuit carrying direct current, 

electric arcs can occur that may result in life-threatening injuries.

  Do NOT unplug the cable when under load.

  Do NOT connect any exposed cable ends.

  Electrical work may only be performed by qualified and skilled 

personnel (see page 3).

A solar module generates electrical current and voltage even 

at a low intensity of illumination. Sparks and electric arcs may 

result from the separation of a closed circuit. These can result 

in life-threatening injuries. The danger increases when several 

modules are connected in series.

  Please be aware of that the entire open circuit voltage is active 

even at low levels of solar irradiation.

  Please follow the valid national regulations and safety 

guidelines for the installation of electrical devices and systems.

  Please make sure to take all necessary safety precautions. With 

module or phase voltages of more than 120 V, the safety extra-

low voltage range is exceeded.

  Carry out work on the inverter and the wiring with extreme 

caution.

  Ensure that the modules are disconnected at the inverter prior 

to separation.

  Be sure to observe the time intervals specified by the inverter 

manufacturer after switching off the inverter.

  Make sure that the plugs can not be connected unintentionally.

  Before working on the contacts, check them for safety extra-

low voltage.

Danger! Risk of fatal injury due to electric shock!

  Only use dry, insulated tools for electrical work.

Danger! Risk of fatal injury due to electric shock!

  Never open the junction box.

  Do not remove bypass diodes.

Danger! Risk of fatal injury due to electric shock!

  Never touch live contacts with bare hands.

  Cover connectors by suitable protective caps until 

installation.

Danger! Risk of fatal injury due to electric shock!

  Insulate any exposed cable ends.

  Only connect cables with plugs.

Summary of Contents for Q.PEAK DUO BLK-G10+ / HL Series

Page 1: ...Installation and operation manual Q PEAK DUO BLK G10 HL solar module series...

Page 2: ...The installer and solar module operator are responsible for compliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times d...

Page 3: ...ystem Your financial success depends on the fulfillment of these requirements Other applicable documents This installation manual is only valid in combination with the following technical information...

Page 4: ...tact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ensure that no additional forces are applied through the mounting system into the module except for the...

Page 5: ...ounting rails If connection cable runs between laminate and mounting it should be running at mounting rails position close to frame parts Modules bend under load Therefore sharp objects e g screws bal...

Page 6: ...ter into account when determining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or...

Page 7: ...nection cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objec...

Page 8: ...electric arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that...

Page 9: ...y only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type a...

Page 10: ...n to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded with the racking system using UL1703 o...

Page 11: ...t taking adequate security precautions Please commission a trade specialist NOTE Module surface damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch o...

Page 12: ...Installation manual solar modules Q PEAK DUO BLK G10 _HL_modules_series_2022 05_Rev01_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL inquiry us q...

Reviews: