1 Introduction

Validity

These instructions are only valid for crystalline solar modules 

from the company Q CELLS as specified at chapter „2.1 Technical 

Specifications“. Q CELLS assumes no liability for damage resulting 

from failure to observe these instructions.

  Please observe the wiring and dimensioning of the system.

  The installer of the system is responsible for compliance with 

all necessary safety regulations during set-up and installation.

Q CELLS assumes no liability on the basis of these instructions. 

Q CELLS is only liable in the context of contractual agreements or 

in the context of accepted guarantees. Q CELLS accepts no other 

responsibility for the functionality and safety of the modules.

  Please observe the instructions for any other system compo-

nents that may be part of the complete solar power system. It 

may be necessary to carry out a structural analysis for the ent-
ire project.

  If your questions are not satisfactorily answered in the manual, 

please contact your system supplier.

Information for the Operator

  Please keep this installation manual for the entire life of the 

solar power system.

  Please contact your system supplier for information concerning 

the formal requirements for solar power systems.

  Please be sure to contact the relevant local authorities 

and energy providers regarding regulations and permit 

requirements prior to installation of the solar power system. 

Your financial success depends on the fulfillment of these 

requirements.

Other applicable documents

This installation manual is only valid in combination with the 

following technical information.

Document type

Product data sheet
Packaging and transport information

MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS 

THE LIMITED WARRANTY AND MAY CREATE A SAFETY 

HAZARD AND RISK PROPERTY DAMAGE. THIS INCLUDES 

IMPROPER INSTALLATION OR CONFIGURATION, IM PROPER 

MAINTENANCE, UNINTENDED USE, AND UNAUTHORIZED 

MODIFICATION.

2 Planning

2.1 Technical specifications

For additional information see the relevant datasheet of the module provided at www.qcells.com.

PRODUCT LINE

Q.PEAK DUO BLK-G10+ / HL

Type

Q.ANTUM DUO Z

Length [in]

67.6 (1717 mm)

Width [in]

41.1 (1045 mm)

Frame height [in]

1.57 (40 mm)

Area [yd²]

2.14 (1.79 m²)

Weight [lbs]

46.3 (21.0 kg)

Max. system voltage V

SYS

1000 V

Max. reverse current

20 A

Permissible temperature range

–40 °F to +185 °F (–40 °C to +85 °C)

Junction box protection class

IP67 with bypass diode

Connector protection class

IP68

Fire rating based on ANSI / UL 61730 TYPE 2
Max. test load Push / Pull

1

 [lbs/ft

2

]

125 / 113 (6,000 Pa / 5,400 Pa)

Max. design load Push / Pull

[lbs/ft

2

]

83 / 75 (4,000 Pa / 3,600 Pa)

Certificates

Quality Controlled PV by TÜV Rheinland; CE-compliant; IEC 61215:2016; IEC 61730:2016; 

PV module classification: Class II; UL 61730

1

 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section "2.3 Mounting options")

NA

DETAIL A

0.63" (16 mm)

0.33" (8.5 mm)

0.837" (21.25 mm)

38.6" (980 mm)

67.6" (1717 mm) 

4 × Mounting slots 

(DETAIL A)

Frame

41.1" (1045 mm)

39.5" (1002,5 mm)

1.57" (40 mm)

8 × Drainage holes

14.5“ (368.5 mm)

4 × Grounding points ø 0.18" (4.5 mm)

Label

45.3" (1150 mm)

45.3" (1150 mm)

Fig. 1: 

External dimensions and components for Q.PEAK DUO BLK-G10+ / HL

Summary of Contents for Q.PEAK DUO BLK-G10+ / HL Series

Page 1: ...Installation and operation manual Q PEAK DUO BLK G10 HL solar module series...

Page 2: ...The installer and solar module operator are responsible for compliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times d...

Page 3: ...ystem Your financial success depends on the fulfillment of these requirements Other applicable documents This installation manual is only valid in combination with the following technical information...

Page 4: ...tact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ensure that no additional forces are applied through the mounting system into the module except for the...

Page 5: ...ounting rails If connection cable runs between laminate and mounting it should be running at mounting rails position close to frame parts Modules bend under load Therefore sharp objects e g screws bal...

Page 6: ...ter into account when determining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or...

Page 7: ...nection cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objec...

Page 8: ...electric arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that...

Page 9: ...y only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type a...

Page 10: ...n to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded with the racking system using UL1703 o...

Page 11: ...t taking adequate security precautions Please commission a trade specialist NOTE Module surface damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch o...

Page 12: ...Installation manual solar modules Q PEAK DUO BLK G10 _HL_modules_series_2022 05_Rev01_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL inquiry us q...

Reviews: