Safety
I
08
CAUTION
The PV string 1 and the PV string 2 must be each connected to the distribution
box terminals, as shown in the distribution board connection diagram.
Make sure that the string numbers match correctly. For example, do not connect
a PV string 1 to a PV string 2.
[ Figure 2-5 : Distribution Box Connection Diagram ]
PVdso2-
PVdso1-
PVdso2-
PVdso1-
LGO
NGO
LG
NG
GRID
LGO
NGO
LG
NG
House (LOAD)
Distribution Board