Page 3 of 14
09-13-568-Rev5
Check crossbar spread is between 492 mm to 892 mm. Insert 2 x M8 Spring Nuts at an equal distance
from the ends of each crossbar. Push Spring Nuts down into the crossbar channels and twist to lock into
place as pictured.
Use the Mounting Bracket to ensure Spring Nuts align with holes in the base of Mounting Bracket.
1
Installation of Recovery Tracks Carrier plus Mounting Brackets on Prorack HD, Tradesman
and other Heavy Duty Crossbars
Referring to Figure 1, secure the 2 x Mounting
Brackets to the M8 Spring Nuts in the crossbars.
Tighten to 4 Nm with 6 mm Allen Key provided
or a suitable Torque Wrench.
2
3
Slide 1 x M8 Slot Nut into the top channel
of Mounting Bracket. Repeat step for other
Mounting Bracket.
M8 Socket Head
Capscrew 25 mm
M8 Spring Washer
M8 Washer
M8 Spring Nut
Fig. 1