SECTION 5
Pronar PT610
5.23
Reinforcing sleeve (4) of the conduit must be thoroughly depressed.
Check tightness of connections in accordance with Chapter (5.3.2).
FIGURE 5.10 Installation of pneumatic conduit
(1) pneumatic conduit, (2) connecting nut (3) clamping ring, (4) reinforcing sleeve
5.4
HYDRAULIC SYSTEM MAINTENANCE
5.4.1 PRELIMINARY INFORMATION
Work connected with the repair, change or regeneration of hydraulic system components
(tipping cylinder, valves etc.) should be entrusted to specialist establishments, having the
appropriate technology and qualifications for this type of work.
The duties of the operator connected with the hydraulic system maintenance include:
•
checking tightness and visual inspection of the system,
•
checking technical condition of hydraulic connections.
Summary of Contents for PT610
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 26: ...Pronar PT610 SECTION 1 1 16 ...
Page 27: ...SECTION 2 SAFETY ADVICE ...
Page 44: ...Pronar PT610 SECTION 2 2 18 FIGURE 2 3 Locations of information and warning decals ...
Page 45: ...SECTION 3 DESIGN AND OPERATION ...
Page 63: ...SECTION 4 CORRECT USE ...
Page 87: ...SECTION 5 MAINTENANCE ...
Page 117: ...SECTION 5 Pronar PT610 5 31 FIGURE 5 12 Trailer s lubrication points part 2 ...
Page 129: ...NOTES ...
Page 130: ... ...